ARIS MINING ANNOUNCES HIGH GRADE DRILL RESULTS FROM ONGOING SEGOVIA OPERATIONS EXPLORATION PROGRAM

In This Article:

VANCOUVER, BC, Aug. 12, 2024 /CNW/ - Aris Mining Corporation (Aris Mining or the Company) (TSX: ARIS) (NYSE-A: ARMN) announces the results received to date from its ongoing 2024 exploration drilling program at its Segovia Operations in Colombia, which is now 70% complete.

Neil Woodyer, CEO of Aris Mining, commented "Our drilling program continues to deliver high grade intersections, confirming the continuity and extension of the large scale veins at depth and along strike, and supporting Segovia's status as one of the highest grade gold operations in the world. The identification of new, near mine mineral resources are expected to progressively lengthen the currently defined mine life, and to provide future low development cost mill feed to supplement the processing plant expansion currently underway. We are especially excited by the results of our ongoing data verification and new drilling programs at Cristales, which are expected to result in significant additions to inferred mineral resources and have the potential to connect the Cristales vein with the substantial vein systems at El Silencio".

Exploration Program

The intersections provided in this news release include results received since the Company's previous exploration news release dated August 16, 2023, which had a data cut-off date of July 31, 2023, up to validated sample assays available as of April 1, 2024. These results are expected to be included in the Company's updated mineral resource and reserve estimates expected in the fourth quarter of 2024.

The Segovia vein system is extensive, with three of the four operating mines following relatively flat lying vein systems ranging between 1.5 and 2.8 kilometres (km) along strike and extending down dip for between 2.0 and 2.7 km. To date, 80 different veins and vein splays have been identified from both surface and underground drilling and underground channel sampling. Most of these large scale structures remain open along strike and down dip. The majority of the exploration drilling is undertaken from within the existing underground mine development and support infrastructure, targeting vein extensions that require relatively lower expenditures to develop and produce. As the vein splays are located in the footwall and hangingwall of the main veins, most of the drillholes intersect multiple veins, providing a high value per drill metre in terms of identifying new mineral resources, and often results in the discovery of new vein structures.

Vein intersection grades remain high after diluting the vein width to the planned mining widths for extraction using narrow vein mining methods. In addition to exploration drilling, ongoing channel samples of the veins at the actively advancing work faces also continue to provide new data to upgrade mineral resources to mineral reserves.