B2Gold Announces Drilling Results from its 2024 Exploration Program at the Goose Project; Drill Results at the Nuvuyak Deposit and Mammoth Target Demonstrate Potential to Further Extend the Mine Life at the Goose Project

In This Article:

B2Gold Corp.
B2Gold Corp.

VANCOUVER, British Columbia, Nov. 13, 2024 (GLOBE NEWSWIRE) -- B2Gold Corp. (TSX: BTO, NYSE AMERICAN: BTG, NSX: B2G) (“B2Gold” or the “Company”) is pleased to announce positive exploration drilling results from its 2024 drilling campaign at the Goose Project, part of the Back River Gold District in Nunavut, Canada. All dollar figures are in United States dollars unless otherwise indicated.

For 2024, B2Gold approved a $28 million exploration budget to complete approximately 25,000 meters (“m”) of drilling on the Back River Gold District, including confirmation drilling at the Umwelt deposit, as well as exploration drilling at several Goose Project regional targets that were developed based on structural modelling and geophysical re-processing.

As of November 7, 2024, B2Gold had completed 25,126 m of drilling over 68 drill holes at the Goose Project, including 14,480 m over 40 drill holes at the Umwelt deposit, 3,899 m over 14 drill holes at the Llama deposit area, 6,610 m over 13 exploration target drill holes, and 137 m over one metallurgical hole at the Goose Main deposit. Significant drill hole locations from 2024 are shown on the map in Figure 1.

Goose Project Drill Results Highlights

  • Exploration drilling intersected high-grade mineralization 1,000 m west and down plunge of the Goose Main deposit at the Goose Project’s Nuvuyak deposit

    • Drill hole 24GSE-683Z1 returned 6.39 grams per tonne (“g/t”) gold over 28.80 m from 982.20 m, including a higher-grade interval of 23.49 g/t gold over 6.45 m and 4.66 g/t gold over 20.94 m from 1,037.16 m, including 8.60 g/t gold over 9.62 m; and

    • This result demonstrates the continuity of high-grade zones within the Nuvuyak deposit by extending high-grade gold mineralization approximately 150 m to the north-northwest.

  • Exploration drilling also intersected high-grade mineralization at the Mammoth target 450 m up plunge of the Nuvuyak deposit towards the Goose Main deposit

    • Mammoth drill hole 24GSE-687Z1 returned 17.45 g/t gold over 10.96 m from 837.14 m, including a higher-grade interval of 68.61 g/t gold over 2.51 m;

    • Mammoth drilling tested down plunge of the fold between the Nuvuyak deposit and the Hook target; and

    • This result demonstrates that the Nuvuyak and Mammoth zones have strong potential for future underground mining.

  • The Nuvuyak deposit and Mammoth target are not included in the existing Goose Project mine plan; these exploration results demonstrate potential to further increase Mineral Resources and extend the mine life at the Goose Project

  • Drill results for infill and mine development at the Goose Project’s Umwelt deposit confirm the continuity of high-grade gold mineralization, with several drill holes returning intercepts with higher gold grades and widths than predicted by the existing mineral resource model

    • Drill hole 24GSE-671 returned 27.28 g/t gold over 11.10 m from 457.80 m;

    • Drill hole 24GSE-675 returned 19.63 g/t gold over 15.95 m from 389.85 m;

    • Drill hole 24GSE-677Z3 returned 9.27 g/t gold over 13.58 m from 664.25 m;

    • Drill hole 24GSE-681 returned 11.18 g/t gold over 15.50 m from 779.45 m;

    • Drill hole 24GSE-684B returned 29.49 g/t gold over 22.79 m from 332.25 m; and

    • Drill hole 24GSE-685 returned 10.51 g/t gold over 21.45 m from 306.00 m.