Brixton Metals Provides Initial Assay Results from its Maiden Drill Program at the Cirque Cu-Mo Porphyry Target

Brixton Metals Corporation
Brixton Metals Corporation

In This Article:

VANCOUVER, British Columbia, Sept. 17, 2024 (GLOBE NEWSWIRE) -- Brixton Metals Corporation (TSX-V: BBB, OTCQB: BBBXF) (the “Company” or “Brixton”) is pleased to announce its third drill hole results of the 2024 season from its wholly owned Thorn Project located in NW British Columbia, Canada. The Thorn Project is an underexplored copper-gold porphyry district with 16 large scale exploration target areas identified. Brixton is operating with two diamond drills and will continue drilling until the end of the season.

Highlights

  • Brixton Metals’ maiden drill program at the Cirque Target has intercepted broad zones of Cu-Mo porphyry style mineralization starting from surface, including:

 

Hole THN24-292 returned:

 

  • 87.00m of 0.26% CuEq including 28.50m of 0.29% CuEq

 

Hole THN24-293 returned:

 

  • 37.50m of 0.28% CuEq within 425.50m of 0.16% CuEq

  • Drilling has targeted a potassic alteration zone with chalcopyrite and molybdenite mineralization at surface, located within a larger 3.6 km x 1.6 km area of phyllic to potassic alteration.

  • The Cirque Porphyry Target is located approximately 3 km NE of the Camp Creek Porphyry Target, on trend along the Camp Creek fault. Geological mapping in 2024 has identified additional areas of porphyry style alteration along this trend.

Vice President of Exploration, Christina Anstey, stated, “The initial drill holes at Cirque have significantly enhanced our understanding of this early-stage drill target. The presence of porphyry style mineralization and alteration is highly encouraging and gives us a strong foundation to build on as we continue to explore and advance this target.”

Project Geologist Leanne Hawkins Highlights the Cirque Target, Thorn Project:

https://www.youtube.com/watch?v=fnXFv7BYMeI

Figure 1. Thorn Project Location Map with Copper Geochemistry.

Figure 1_17Sept2024
Figure 1_17Sept2024


Table 1. Select Assay Intervals for Initial Drilling at the Cirque Porphyry Target.

Hole ID

From (m)

To (m)

Interval (m)

Cu (%)

Au (g/t)

Ag (g/t)

Mo (ppm)

CuEq (%)

THN24-292

14.75

401.00

386.25

0.10

0.04

1.81

47

0.16

including

126.00

213.00

87.00

0.20

0.04

2.61

34

0.26

including

135.00

163.50

28.50

0.23

0.03

3.22

30

0.29

including

135.00

145.50

10.50

0.37

0.04

5.22

36

0.44

THN24-293

8.40

433.90

425.50

0.11

0.02

1.76

42

0.16

including

144.00

335.50

191.50

0.14

0.02

1.91

51

0.19

including

145.50

223.50

78.00

0.19

0.02

2.37

34

0.23

including

189.00

226.50

37.50

0.24

0.02

2.79

39

0.28

THN24-295

556.50

787.00

230.50

0.05

0.02

2.67

20

0.09

including

664.50

704.00

39.50

0.09

0.04

6.28

35

0.18

including

667.50

686.10

18.60

0.09

0.05

9.81

33

0.22

including

667.50

677.30

9.80

0.10

0.06

14.69

58

0.30


HQ size core samples were cut in half and sampled predominantly at 1.5m intervals. Assay values are weighted averages. The true width of the mineralized intervals has not yet been determined.