Caprock Makes Second Zinnwaldite Discovery at Ackley - Announces Multiple New High-Grade Lithium Assays

In This Article:

Toronto, Ontario--(Newsfile Corp. - January 17, 2024) - Caprock Mining Corp. (CSE: CAPR) ("Caprock" or the "Company") is pleased to announce a second discovery of lithium-bearing zinnwaldite mineralization ("Area 2") in addition to the previously discussed Deer Pond Area within the eastern-most claim block (the "Main Claim Block") at its Ackley Lithium-Tin-Molybdenum-REEs property ("Ackley", or the "Property") located in south-eastern Newfoundland, for which the Company has an option to acquire a 100% interest.

Highlights from this latest batch of sample assays are provided in Figure 1 below.

Sample ID

Area

Li2O %

 

 

 

AC23-57

Deer Pond

1.00

AC23-58

Deer Pond

1.07

AC23-59

Deer Pond

0.83

AC23-62

Deer Pond

0.99

AC23-51

Area 2

0.45

AC23-52

Area 2

0.70

AC23-53

Area 2

0.74

AC23-07

Area 2

0.53

AC23-08

Area 2

0.54

AC23-09

Area 2

0.56

 

Figure 1: New Assay Highlights from Samples at Area 2 and the Deer Pond Area

Caprock's CEO Mr. Vishal Gupta states: "The discovery of high-grade lithium-bearing zinnwaldite at Area 2 that lies over one kilometre to the north-west of the first batch of samples at the Deer Pond Area for which multiple assays of over 1.00% Li2O were announced previously, reinforces our belief that a significant portion of the vast greisen zone at Ackley may contain appreciable lithium mineralization. Today we also announce additional new assays from the Deer Pond Area (included in Figure 1 above), further demonstrating the high-grade nature of the lithium mineralization at Ackley."

Mr. Gupta goes on to say: "Zinnwaldite is a superior host to lithium than the highly sought-after mineral, spodumene. The production of lithium hydroxide from zinnwaldite requires considerably less energy and capital than from spodumene, as has been demonstrated by the Cinovec project in the Czech Republic, and the Zinnwald project in Germany. As we analyze data collected from our limited prospecting and sampling programs conducted in 2023, our main objectives at Ackley for 2024 are to (a) complete geological mapping and sampling in the remainder of the prospective areas within the Main Claim Block, (b) corroborate our geological understanding with high-resolution geophysical surveys, (c) delineate targets for an exploratory drill program, and if all other objectives are met, then (d) commence an initial drilling campaign to test a limited number of delineated targets."

For additional information on zinnwaldite, please refer to the press release dated November 29, 2023 by clicking the following link: Caprock-Mining-PR-20231128-Zinnwaldite-Confirmation-PR-Draft-7-FINAL.pdf (caprockmining.com)