CENTURY LITHIUM FILES TECHNICAL REPORT ON THE FEASIBILITY STUDY OF THE CLAYTON VALLEY LITHIUM PROJECT, NEVADA

In This Article:

VANCOUVER, BC, June 13, 2024 /PRNewswire/ - Century Lithium Corp. (TSXV: LCE) (OTCQX: CYDVF) (Frankfurt: C1Z) (Century Lithium or the Company) is pleased to announce the filing of the report "NI 43-101 Technical Report on the Feasibility Study of the Clayton Valley Lithium Project, Esmeralda County, Nevada, USA", with effective date April 29, 2024 (Feasibility Study or Report), to support the disclosure in the Company's news release dated April 29, 2024 (see news release). The Report was prepared in accordance with National Instrument 43-101 (NI 43-101) by Wood Canada Limited (Wood), Global Resource Engineering, Ltd. (GRE) and WSP USA Environment and Infrastructure, Inc. (WSP). All currency amounts in this news release are presented in US dollars.

Century Lithium Files Technical Report on the Feasibility Study for the Clayton Valley Lithium Project, Nevada (CNW Group/Century Lithium Corp.)
Century Lithium Files Technical Report on the Feasibility Study for the Clayton Valley Lithium Project, Nevada (CNW Group/Century Lithium Corp.)

"Century Lithium is pleased to file the report on the Feasibility Study of our Clayton Valley Lithium Project," said Bill Willoughby, President, and CEO. "The Report is the culmination of the dedicated work of our team of employees and consultants and highlights the economic benefits of the Project made possible by Century's unique use of chlor-alkali and direct lithium extraction processing. The filing of the report now marks another major milestone for the Company."

During the preparation of the Report, minor changes were made to the parameters used to determine the Mineral Resource and Reserve Estimates. The resulting economic analysis is effectively unchanged. Using a base case price of $24,000/tonne of lithium carbonate, the Project after-tax cash flow has a 17.2% Internal Rate of Return (IRR) and a $3.16 billion Net Present Value (NPV) at an 8% discount rate.

RESOURCE AND RESERVES

The Mineral Resource and Reserve Estimates for the Project were updated for the Report and built using geologic data and 1,318 lithium assays from 45 core holes drilled between 2017 and 2022 and have an effective date of April 29, 2024. The constrained Measured and Indicated Resource Estimate is 1,138.59 million tonnes (Mt) with an average grade of 966 parts per million (ppm) lithium and contains 1.099 Mt of lithium or 5.852 Mt of lithium carbonate equivalent (LCE). The Proven and Probable Mineral Reserve Estimate was derived from the constrained Mineral Resources and contains 287.65 Mt with an average grade of 1,149 ppm lithium and contains 0.330 Mt of lithium or 1.759 Mt of LCE.

Mineral Resource Estimate

Domain

Tonnes Above
Cut-off (millions)

Li Grade (ppm)

Li Contained

(million t)

LCE (million t)

Measured

858.26

990

0.850

4.523

Indicated

280.33

891

0.250

1.329

Measured & Indicated

1,138.59

966

1.099

5.582

Inferred

187.28

820

0.154

0.817

1.The effective date of the Mineral Resource Estimate is April 29, 2024. The QP for the estimate is Ms. Terre Lane, MMSA, an employee of GRE and independent of Century.

2.The Mineral Resources are constrained by a pit shell with a 200 ppm Li cut-off and density of 1.505 g/cm3. The cut-off grade considers an operating cost of$20/t mill feed, process recovery of 78% and a long-term lithium carbonate price of $24,000/t.

3.The Mineral Resource estimate was prepared in accordance with 2014 CIM Definition Standards and the 2019 CIM Best Practice Guidelines.

4.Mineral Resource figures have been rounded.

5.One tonne of lithium = 5.323 tonnes lithium carbonate.

6.Mineral Resources are inclusive of Mineral Reserves.