DLP Resources intersects 339.35m of 0.76% CuEq* within a 1058.35m interval of 0.38% CuEq*, on the Aurora Project

In This Article:

Cranbrook, British Columbia--(Newsfile Corp. - November 4, 2024) - DLP Resources Inc. (TSXV: DLP) (OTCQB: DLPRF) ("DLP" or the "Company") announces receipt of complete drill results for drillhole A24-020 on the Aurora porphyry copper-molybdenum-silver project in southern Peru. (Figure 1).

Highlights

  • Drillhole A24-020 was drilled approximately 135m southeast of A24-016 with the aim of expanding the copper mineralization to the southeast. This drillhole intersected copper-silver and molybdenum mineralization from 3.00m to the end of the hole at 1061.35m. Summary results were as follows:

    • 0.38% CuEq* over 1058.35m from 3.00m to 1061.35m.

    • 0.44% CuEq* over 874.35m from 187.00m to 1061.35m.

    • 0.76% CuEq* over 339.35m from 722.00m to 1061.35m.

    • 0.87% CuEq* over 284.00m from 722.00m to 1006.00m.

The complete set of results for A24-020 are summarized in Table 1 below.

Mr. Gendall, President and CEO, commented: "Drillhole A24-020 has opened up the extension of the copper-molybdenum-silver mineralization to the southeast of Aurora and has yielded very good mineralization from surface to the end depth of 1061.35m. The drillhole was unfortunately stopped in molybdenum mineralization due to the maximum capacity of the drill rig. We have intersected very good copper-molybdenum-silver mineralization in all 20 drillholes drilled to date and we are very encouraged with advancing Aurora to an initial resource estimation by March 2025.

Aurora Cu-Mo Project - Summary of Drill Results for A24-020

Drill hole A24-020 (Figures 2,3,4 and 5) commenced on September 01, 2024 at an inclination of -70 degrees on an azimuth of 285 degrees and ended on October 05, at 1061.35m. Summary geology is as follows:

  • 0-3.00m: No core recovered - Overburden.

  • 3.00 - 349.00m: Mineralized hornfels.

  • 349.00 - 378.40m: Mineralized quartz-eye-feldspar-biotite porphyry.

  • 378.40 - 712.75m: Mineralized hornfels.

  • 712.75 - 767.35m: Mineralized hornfels and quartz-eye-feldspar-biotite porphyry.

  • 767.35 - 1061.35m: Mineralized quartz-eye-feldspar-biotite porphyry.

Table 1. Summary of Drill Results for Diamond Drillhole A24-020. All grades are length-weighted averages of samples within the interval reported.

Hole

From

To

Interval1

Description

Cu (total)

Mo

Ag

CuEq*

ID

m

m

m

%

%

g/t

%

   A24-020

3.00

1061,35

 1058.35

Mineralized hornfels and porphyry

0.13

0.0493

1.14

0.38

 Includes

187.00

1061.35

 874.35

Mineralized hornfels and porphyry

0.14

0.0595

1.26

0.44

 Includes

405.00

615.00

 210.00

Mineralized hornfels

0.21

0.0092

2.54

0.27

 Includes

405.00

463.00

 58.00

Mineralized hornfels

0.33

0.0133

4.42

0.43

 Includes

722.00

1061.35

 339.35

Mineralized porphyry with minor intercalated hornfels

0.10

0.1323

1.21

0.76

 Includes

722.00

1006.00

 284.00

Mineralized porphyry with minor intercalated hornfels

0.12

0.1473

0.81

0.87