Erdene Reports Strong Drill Results and Provides Mine Development Update for the Bayan Khundii Gold Project

Erdene Resource Development Corporation
Erdene Resource Development Corporation

In This Article:

Bayan Khundii Gold Deposit Plan Map

Q3 Drilling Highlights
Q3 Drilling Highlights

HALIFAX, Nova Scotia, Sept. 25, 2024 (GLOBE NEWSWIRE) -- Erdene Resource Development Corp. (TSX:ERD | MSE:ERDN) ("Erdene" or the "Company") is pleased to provide results from shallow drilling within the initial mining areas of the Bayan Khundii orebody and to provide an update on mine development for the Bayan Khundii Gold Project (“BK Project”) currently under construction. The BK Project is being developed by Erdene Mongol LLC (“EM”), a company jointly owned by Erdene and its partner, Mongolian Mining Corporation (“MMC”).

Peter Akerley, Erdene’s President and CEO stated, “Results from the first phase of the Bayan Khundii ore control drilling program confirm the high-grade nature of the deposit, consistent with the reserve model in near surface zones. A 13,500 metre reverse circulation (“RC”) drill program will begin in the coming weeks to collect data to finalize the mine plan in advance of the commencement of mining in Q1 2025.”

Mr. Akerley continued, “Additionally, exploration drilling on the periphery of the Bayan Khundii economic pit was recently completed to test expansion targets. Those results, expected within the next couple of weeks, will be analyzed in conjunction with current gold prices, to update the mine plan as we work towards first gold from Bayan Khundii in mid-2025.”

Drill Results

During Q3 2024, EM completed an ore control drill program consisting of 89 shallow diamond drill holes totaling 1,048 metres. This program focused on the high-grade domains, within 15 metres of surface, scheduled to be developed in the first 3-4 months of mining. Additionally, 10 holes, totaling 456 metres, were drilled to greater depth to assist with future mine planning. The program utilized diamond core to gather detail on the orientation and character of these ore zones. Results confirmed the high-grade domains in the current block model with highlights displayed in the following table. Full results are included as an appendix to this release.

Drilling Highlights – Diamond Drilling Program – Q3 2024

Hole ID

Hole Depth

From

To

Interval

g/t Au

Midfield SE

 

 

 

30370

12

4

10

6

9.52

Incl

 

4

5

1

50.70

30811

12

2

6

4

4.70

Incl

 

3

4

1

12.90

31034

17

7

10

3

9.42

Incl

 

8

9

1

20.10

31253

10

0.85

7

6.15

7.63

Incl

 

4

5

1

38.40

31254

15

4

8

4

21.70

Incl

 

5

7

2

41.55

31474

10

1

6

5

21.87

Incl

 

3

5

2

49.35

31475

16

5

8

3

19.16

Incl

 

5

6

1

56.70

31476

18

8

11

3

33.29

Incl

 

9

10

1

99.00

31695

11

3

6

3

70.61

Incl

 

3

5

2

105.85

Incl

 

4

5

1

198.00

32580

20

10

14

4

3.71

Incl

 

11

12

1

11.50

And

 

19

20

1

1.06

Striker

 

 

 

 

26384

12

6

9

3

2.18

26385

13

9

13

4

9.26

Incl

 

11

12

1

30.80

26603

16

13

16

3

4.83

Incl

 

14

15

1

14.10

26604

16

6

13

7

5.56

Incl

 

9

10

1

11.80

Incl

 

11

12

1

12.30

27494

48

33

48

15

2.75

Incl

 

34

36

2

16.45

27717

45

17

43

26

2.03

Incl

 

24

41

17

2.91

Incl

 

24

25

1

11.40

South Striker

 

 

 

22168

20

2

14

12

2.96

Incl

 

11

12

1

18.40

22389

18

0

7

7

4.13

Incl

 

5

6

1

16.50

23044

5

0

5

5

4.30

Incl

 

0

1

1

15.50

23045

14

0

9

9

8.32

Incl

 

0

6

6

12.20

Incl

 

0

3

3

21.70

23046

15

0

12

12

6.61

Incl

 

1

7

6

11.21

Incl

 

3

4

1

31.00

Incl

 

5

6

1

11.60

23047

11

0

11

11

4.46

Incl

 

4

8

4

10.72

Incl

 

4

5

1

16.70

Incl

 

7

8

1

12.30

23266

14

1

14

13

3.68

Incl

 

8

10

2

14.90

23267

12

0

12

12

4.66

Incl

 

9

10

1

20.40

23927

6

0.3

6

5.7

14.82

Incl

 

3

4

1

68.20

Note: Reported intervals are apparent thicknesses, i.e., downhole widths. The current Bayan Khundii drill holes (reported in this release) are all vertical. True widths are estimated to be between 60% and 90% of the downhole width. This Highlights table includes all holes with a minimum of 1m with >10 g/t gold. See Appendix of full results.