Fortuna intersects 14.2 g/t Au over 16.8 meters at the Kingfisher prospect, Séguéla Mine, C?te d’Ivoire

Fortuna Mining Corp.
Fortuna Mining Corp.

In This Article:

VANCOUVER, British Columbia, Sept. 10, 2024 (GLOBE NEWSWIRE) -- Fortuna Mining Corp. (NYSE: FSM | TSX: FVI) is pleased to provide an update on its exploration programs at the Séguéla Mine in C?te d’Ivoire.

Séguéla Mine exploration highlights

Paul Weedon, Senior Vice President of Exploration at Fortuna, commented, “Kingfisher is rapidly shaping up as a substantial prospect for Séguéla, with a drill defined strike now over 2 kilometers in length and it remains open at depth. Recent drilling highlights include 14.2 g/t Au over an estimated true width of 16.8 meters from 100 meters from drill hole SGRC1865 with mineralization remaining open at depth.” Mr. Weedon continued, “In addition to exploration success at Kingfisher, infill and depth extension drilling at the Sunbird deposit continues to support underground mining potential, with results including 8.8 g/t Au over an estimated true width of 6.3 meters from 301 meters from drill hole SGDD140.”

Kingfisher prospect drilling highlights include:

SGRC1865:

14.2 g/t Au
31.0 g/t Au
29.6 g/t Au
64.6 g/t Au

over an estimated true width of 16.8 meters from 100 meters, including
over an estimated true width of 1.4 meters from 105 meters, and
over an estimated true width of 1.4 meters from 115 meters, and
over an estimated true width of 1.4 meters from 120 meters

SGRC1866:

3.0 g/t Au

over an estimated true width of 18.2 meters from 21 meters

SGRC1869:

2.7 g/t Au

over an estimated true width of 30.1 meters from 68 meters

SGRD1874:

5.5 g/t Au

over an estimated true width of 9.1 meters from 89 meters

SGRD1879:

3.7 g/t Au

over an estimated true width of 15.4 meters from 129 meters


A further 58 holes for 6,966 meters was completed at the Kingfisher prospect (refer to Figure 1), defining continuous mineralization over more than 2 kilometers of strike and merging the previous three separate lodes into a single zone of continuous mineralization (refer to Figure 2). Drilling is continuing, testing the depth potential along this zone with additional exploratory drilling planned to the south where only minimal surface geochemistry is available. Kingfisher was a “blind” discovery with 1 to 2 meters of transported cover giving rise to very muted or no geochemical signature. Kingfisher remains open at depth for most of the drilled 2-kilometer strike, with the deepest drilling only testing to approximately 200 meters below surface (refer to Figure 3).

Additional drilling at Kingfisher has further refined the understanding of the mineralization controls, with a clear association identified along the strongly deformed contact zone between a series of felsic intrusives, quartz veining, and host basaltic units. The change in strike orientation along the structure from north-south to north-east coincides with the higher grade, broader mineralization intervals. Mineralization is characterized by silica-biotite-sericite-carbonate alteration and pyrite development within and adjacent to the quartz veining, similar to the Boulder and Agouti deposits, 1 to 3 kilometers further north in the same sequence and in similar structural positions. This structure has been identified from regional aeromagnetic surveys as extending the 32-kilometer length of the Seguela permit, highlighting the regional prospectivity of the project.

Drilling is scheduled with two drilling rigs to continue throughout the remainder of 2024 with the aim of expanding the strike and depth potential of Kingfisher and supporting a maiden Inferred resource early in 2025.

Figure 1: Location of the Kingfisher prospect

Figure 1: Location of the Kingfisher prospect
Figure 1: Location of the Kingfisher prospect

Figure 2: Kingfisher prospect long-section - looking west

Figure 2: Kingfisher prospect long-section - looking west
Figure 2: Kingfisher prospect long-section - looking west

Figure 3: Kingfisher prospect cross section line 892550 - looking north

Figure 3: Kingfisher prospect cross section line 892550 - looking north
Figure 3: Kingfisher prospect cross section line 892550 - looking north

Sunbird Deposit drilling highlights include:

SGDD139:

8.5 g/t Au

over an estimated true width of 5.6 meters from 375 meters

SGDD140:

4.2 g/t Au
8.8 g/t Au
4.6 g/t Au

over an estimated true width of 7.7 meters from 268 meters, and
over an estimated true width of 6.3 meters from 301 meters, and
over an estimated true width of 8.4 meters from 324 meters

SGRD2082:

8.0 g/t Au

over an estimated true width of 4.9 meters from 264 meters

SGRD2083:

6.6 g/t Au

over an estimated true width of 6.3 meters from 359 meters


At Sunbird, results from the first 5 holes, totaling 2,010 meters of a planned 12,000-meter drilling program have been received, including 8.8 g/t Au over an estimated true width of 6.3 meters from 301 meters in drill hole SGDD140 (refer to Figure 4). The program is designed to infill and extend the current mineralized footprint as part of a program to evaluate underground mining potential, with mineralization remaining open 600 meters below surface, or more than 800 meters down plunge from the margin of the planned open pit.

This work will continue for the remainder of 2024, supported by preliminary underground mining studies.

Figure 4: Sunbird long section - looking west

Figure 4: Sunbird long section - looking west
Figure 4: Sunbird long section - looking west

Refer to Appendix 1 for full details of the drill holes and assay results for this drill program at the Séguéla Gold Mine.

Quality Assurance & Quality Control (QA - QC)

All drilling data completed by the Company utilized the following procedures and methodologies. All drilling was carried out under the supervision of the Company’s personnel.

All reverse circulation (RC) drilling used a 5.25-inch face sampling pneumatic hammer with samples collected into 60-liter plastic bags. Samples were kept dry by maintaining enough air pressure to exclude groundwater inflow. If water ingress exceeded the air pressure, RC drilling was stopped, and drilling converted to diamond core tails. Once collected, RC samples were riffle split through a three-tier splitter to yield a 12.5% representative sample for submission to the analytical laboratory. The residual 87.5% samples were stored at the drill site until assay results were received and validated. Coarse reject samples for all mineralized samples corresponding to significant intervals are retained and stored on-site at the Company-controlled core yard.

All diamond drilling (DD) drill holes started with HQ sized diameter, before reducing to NQ diameter diamond drill bits on intersecting fresh rock. The core was logged, marked up for sampling using standard lengths of one meter or to a geological boundary. Samples were then cut into equal halves using a diamond saw. One half of the core was left in the original core box and stored in a secure location at the Company core yard at the project site. The other half was sampled, catalogued, and placed into sealed bags and securely stored at the site until shipment.

All RC and DD samples were transported to ALS’s preparation laboratory in Yamoussoukro, Cote d’Ivoire before also being transported via commercial courier, to ALS’s facility in Ouagadougou, Burkina Faso. Routine gold analysis using a 50-gram charge and fire assay with an atomic absorption finish was completed for all samples. Quality control procedures included the systematic insertion of blanks, duplicates and sample standards into the sample stream. In addition, the ALS laboratory inserted its own quality control samples.

Qualified Person

Paul Weedon, Senior Vice President of Exploration for Fortuna Mining Corp., is a Qualified Person as defined by National Instrument 43-101 being a member of the Australian Institute of Geoscientists (Membership #6001). Mr. Weedon has reviewed and approved the scientific and technical information contained in this news release. Mr. Weedon has verified the data disclosed, including the sampling, analytical and test data underlying the information or opinions contained herein by reviewing geochemical and geological databases and reviewing diamond drill core. There were no limitations to the verification process.

About Fortuna Mining Corp.

Fortuna Mining Corp. is a Canadian precious metals mining company with five operating mines in Argentina, Burkina Faso, C?te d'Ivoire, Mexico, and Peru, as well as the preliminary economic assessment stage Diamba Sud Gold Project located in Senegal. Sustainability is integral to all our operations and relationships. We produce gold and silver and generate shared value over the long-term for our stakeholders through efficient production, environmental protection, and social responsibility. For more information, please visit our website.

ON BEHALF OF THE BOARD

Jorge A. Ganoza
President, CEO, and Director
Fortuna Mining Corp.

Investor Relations:
Carlos Baca | [email protected] | fortunamining.com | X | LinkedIn | YouTube

Forward-looking Statements

This news release contains forward-looking statements which constitute “forward-looking information” within the meaning of applicable Canadian securities legislation and “forward-looking statements” within the meaning of the “safe harbor” provisions of the Private Securities Litigation Reform Act of 1995 (collectively, “Forward-looking Statements”). All statements included herein, other than statements of historical fact, are Forward-looking Statements and are subject to a variety of known and unknown risks and uncertainties which could cause actual events or results to differ materially from those reflected in the Forward-looking Statements. The Forward-looking Statements in this news release include, without limitation, statements about the exploration potential at the Kingfisher prospect, including the proposed plan to continue with exploratory drilling to the south of the prospect; and to continue drilling with two rigs throughout the remainder of 2024 with the intention of supporting a maiden inferred mineral resource in early 2025; statements about the exploration potential at the Sunbird deposit which may support the potential for underground mining at the Sunbird deposit; the Company’s objectives for the current drilling program at the Séguéla Mine and expectations regarding additional drilling and exploration programs planned; the Company’s business strategy, plans and outlook; the merit of the Company’s mines and mineral properties; mineral resource and reserve estimates; timelines; the future financial or operating performance of the Company; expenditures; approvals and other matters. Often, but not always, these Forward-looking Statements can be identified by the use of words such as “estimated”, “potential”, “open”, “future”, “assumed”, “projected”, “used”, “detailed”, “has been”, “gain”, “planned”, “reflecting”, “will”, “containing”, “remaining”, “to be”, or statements that events, “could” or “should” occur or be achieved and similar expressions, including negative variations. Forward-looking Statements involve known and unknown risks, uncertainties and other factors which may cause the actual results, performance or achievements of the Company to be materially different from any results, performance or achievements expressed or implied by the Forward-looking Statements. Such uncertainties and factors include, among others, changes in general economic conditions and financial markets; changes in prices for gold, silver, and other metals; the timing and success of the Company’s proposed exploration programs; technological and operational hazards in Fortuna’s mining and mine development activities; risks inherent in mineral exploration; fluctuations in prices for energy, labour, materials, supplies and services; fluctuations in currencies; uncertainties inherent in the estimation of mineral reserves, mineral resources, and metal recoveries; the possibility that the appeal in respect of the ruling in favor of Compa?ia Minera Cuzcatlan S.A. de C.V. reinstating the environmental impact authorization at the San Jose Mine (the “EIA”) will be successful; the Company’s ability to obtain all necessary permits, licenses and regulatory approvals in a timely manner; governmental and other approvals; political unrest or instability in countries where Fortuna is active; labor relations issues; as well as those factors discussed under “Risk Factors” in the Company's Annual Information Form for the financial year ended December 31, 2023. Although the Company has attempted to identify important factors that could cause actual actions, events or results to differ materially from those described in Forward-looking Statements, there may be other factors that cause actions, events or results to differ from those anticipated, estimated or intended. Forward-looking Statements contained herein are based on the assumptions, beliefs, expectations and opinions of management, including but not limited to expectations regarding the results from the exploration programs conducted at the Company’s mineral properties including the Diamba Sud Gold Project; expected trends in mineral prices and currency exchange rates; the accuracy of the Company’s information derived from its exploration programs at the Company’s mineral properties; current mineral resource and reserve estimates; the presence and continuity of mineralization at the Company’s properties; that the Company’s activities will be in accordance with the Company’s public statements and stated goals; that there will be no material adverse change affecting the Company or its properties; that the appeal filed in the Mexican Collegiate Court challenging the reinstatement of the EIA will be unsuccessful; that all required approvals will be obtained; that there will be no significant disruptions affecting operations and such other assumptions as set out herein. Forward-looking Statements are made as of the date hereof and the Company disclaims any obligation to update any Forward-looking Statements, whether as a result of new information, future events or results or otherwise, except as required by law. There can be no assurance that Forward-looking Statements will prove to be accurate, as actual results and future events could differ materially from those anticipated in such statements. Accordingly, investors should not place undue reliance on Forward-looking Statements.

Cautionary Note to United States Investors Concerning Estimates of Reserves and Resources

Reserve and resource estimates included in this news release have been prepared in accordance with National Instrument 43-101 Standards of Disclosure for Mineral Projects ("NI 43-101") and the Canadian Institute of Mining, Metallurgy, and Petroleum Definition Standards on Mineral Resources and Mineral Reserves. NI 43-101 is a rule developed by the Canadian Securities Administrators that establishes standards for public disclosure by a Canadian company of scientific and technical information concerning mineral projects. Unless otherwise indicated, all mineral reserve and mineral resource estimates contained in the technical disclosure have been prepared in accordance with NI 43-101 and the Canadian Institute of Mining, Metallurgy and Petroleum Definition Standards on Mineral Resources and Reserves. Canadian standards, including NI 43-101, differ significantly from the requirements of the Securities and Exchange Commission, and mineral reserve and resource information included in this news release may not be comparable to similar information disclosed by U.S. companies.

Appendix 1 - Séguéla Mine

HoleID

Easting (WGS84_29N)

Northing (WGS84_29N)

Elev (m)

EOH Depth (m)

UTM Azimuth

Dip

Depth From 
(m)

Depth To (m)

Drilled Width (m)

ETW (m)

Au (ppm)

Hole Type

Area

SGRC1858

743649

891799

390

90

90

-60

 

 

0

0

NSI

RC

Kingfisher

SGRC1859

743613

891797

412

116

90

-60

 

 

0

0

NSI

RC

Kingfisher

SGRC1860

743673

892350

371

66

90

-60

40

41

1

0.7

5.6

RC

Kingfisher

 

 

 

 

 

 

 

47

48

1

0.7

11.6

RC

Kingfisher

SGRC1861

743641

892349

373

136

90

-60

85

90

5

3.5

4.7

RC

Kingfisher

 

 

 

 

 

 

Incl.

85

86

1

0.7

15.3

RC

Kingfisher

 

 

 

 

 

 

 

95

130

35

24.5

1.9

RC

Kingfisher

SGRC1862

743639

892300

401

150

90

-60

77

87

10

7

0.6

RC

Kingfisher

 

 

 

 

 

 

 

92

131

39

27.3

1.7

RC

Kingfisher

 

 

 

 

 

 

Incl.

119

120

1

0.7

12.1

RC

Kingfisher

SGRC1863

743669

892302

396

72

90

-60

67

72

5

3.5

1.2

RC

Kingfisher

SGRC1864

743671

892247

388

96

90

-60

19

27

8

5.6

0.7

RC

Kingfisher

 

 

 

 

 

 

 

47

53

6

4.2

4.7

RC

Kingfisher

 

 

 

 

 

 

Incl.

48

49

1

0.7

14.9

RC

Kingfisher

 

 

 

 

 

 

 

57

77

20

14

4.3

RC

Kingfisher

 

 

 

 

 

 

Incl.

70

72

2

1.4

27.5

RC

Kingfisher

 

 

 

 

 

 

 

83

95

12

8.4

3.8

RC

Kingfisher

 

 

 

 

 

 

Incl.

85

87

2

1.4

15.2

RC

Kingfisher

SGRC1865

743639

892253

394

130

90

-60

63

70

7

4.9

0.8

RC

Kingfisher

 

 

 

 

 

 

 

75

86

11

7.7

0.7

RC

Kingfisher

 

 

 

 

 

 

 

100

124

24

16.8

14.2

RC

Kingfisher

 

 

 

 

 

 

Incl.

101

102

1

0.7

18.7

RC

Kingfisher

 

 

 

 

 

 

And

105

107

2

1.4

31.1

RC

Kingfisher

 

 

 

 

 

 

And

115

117

2

1.4

29.6

RC

Kingfisher

 

 

 

 

 

 

And

118

119

1

0.7

21.4

RC

Kingfisher

 

 

 

 

 

 

And

120

122

2

1.4

64.6

RC

Kingfisher

SGRC1866

743688

892151

399

52

90

-60

21

47

26

18.2

3.0

RC

Kingfisher

 

 

 

 

 

 

Incl.

39

40

1

0.7

11.6

RC

Kingfisher

SGRC1867

743654

892151

400

114

90

-60

35

39

4

2.8

12.6

RC

Kingfisher

 

 

 

 

 

 

incl.

37

38

1

0.7

42.9

RC

Kingfisher

 

 

 

 

 

 

 

53

60

7

4.9

1.1

RC

Kingfisher

 

 

 

 

 

 

 

65

72

7

4.9

3.2

RC

Kingfisher

 

 

 

 

 

 

 

77

79

2

1.4

10.6

RC

Kingfisher

 

 

 

 

 

 

incl.

77

78

1

0.7

20.6

RC

Kingfisher

SGRC1869

743626

892150

408

157

90

-60

68

111

43

30.1

2.7

RC

Kingfisher

 

 

 

 

 

 

incl.

69

70

1

0.7

14.1

RC

Kingfisher

 

 

 

 

 

 

and

75

76

1

0.7

14.2

RC

Kingfisher

SGRC1870

743671

892051

411

67

90

-60

 

 

0

0

NSI

RC

Kingfisher

SGRC1872

743643

892050

414

114

90

-60

45

64

19

13.3

0.6

RC

Kingfisher

 

 

 

 

 

 

 

73

79

6

4.2

1.2

RC

Kingfisher

SGRD1873

743606

892349

407

190

90

-60

113

122

9

6.3

1.9

RC

Kingfisher

 

 

 

 

 

 

 

126

139

13

9.1

1.0

RC

Kingfisher

 

 

 

 

 

 

 

143

147

4

2.8

1.5

RC

Kingfisher

SGRD1874

743637

892200

398

190

90

-60

53

78

25

17.5

2.1

RC

Kingfisher

 

 

 

 

 

 

incl.

62

63

1

0.7

15.3

RC

Kingfisher

 

 

 

 

 

 

 

89

102

13

9.1

5.5

RC

Kingfisher

 

 

 

 

 

 

incl.

93

94

1

0.7

16.4

RC

Kingfisher

 

 

 

 

 

 

and

98

99

1

0.7

12.1

RC

Kingfisher

 

 

 

 

 

 

 

106

117

11

7.7

4.1

RC

Kingfisher

 

 

 

 

 

 

incl.

113

114

1

0.7

31.1

RC

Kingfisher

SGRD1875

743607

892303

408

200

90

-60

115

125

10

7

2.0

RC

Kingfisher

 

 

 

 

 

 

incl.

119

120

1

0.7

10.2

RC

Kingfisher

SGRD1876

743609

892050

420

180

90

-60

 

 

0

0

NSI

RC

Kingfisher

SGRD1877

743609

892252

396

180.4

90

-60

101

123

22

15.4

1.4

RC

Kingfisher

 

 

 

 

 

 

 

130

136

6

4.2

3.6

RC

Kingfisher

 

 

 

 

 

 

 

140

142

2

1.4

3.1

RC

Kingfisher

SGRD1878

743588

892091

420

210

90

-60

143

147

4

2.8

1.7

RC

Kingfisher

SGRD1879

743584

892150

399

230

90

-60

111

118

7

4.9

3.9

RC

Kingfisher

 

 

 

 

 

 

incl.

111

112

1

0.7

11.6

RC

Kingfisher

 

 

 

 

 

 

 

129

151

22

15.4

3.7

RC

Kingfisher

 

 

 

 

 

 

incl.

131

134

3

2.1

17.6

RC

Kingfisher

SGRC2029

743680

891950

411

50

90

-60

0

5

5

3.5

1.3

RC

Kingfisher

SGRC2030

743650

891951

414

110

90

-60

 

 

0

0

NSI

RC

Kingfisher

SGRD2043

743582

891749

400

190

90

-60

 

 

0

0

NSI

RC

Kingfisher

SGRD2044

743533

891492

388

190.4

90

-60

 

 

0

0

NSI

RC

Kingfisher

SGRC2045

743622

891451

384

60

90

-60

 

 

 

 

2.0

RC

Kingfisher

SGRC2046

743595

891399

387

100

90

-60

 

 

 

 

NSI

RC

Kingfisher

SGRD2048

743575

891341

377

132

90

-60

70

78

8

5.6

1.1

RC

Kingfisher

 

 

 

 

 

 

 

85

93

8

5.6

0.7

RC

Kingfisher

SGRC2049

743590

891149

360

54

90

-60

 

 

0

0

NSI

RC

Kingfisher

SGRC2050

743560

891150

363

121

90

-60

 

 

0

0

NSI

RC

Kingfisher

SGRD2051

743615

891950

425

180

90

-60

69

90

21

14.7

0.9

RC

Kingfisher

SGRC2052

743591

891550

411

105

90

-60

 

 

0

0

NSI

RC

Kingfisher

SGRD2053

743565

891550

394

171

90

-60

 

 

0

0

NSI

RCD

Kingfisher

SGRC2054

743591

891273

351

100

90

-60

72

76

4

2.8

3.9

RC

Kingfisher

 

 

 

 

 

 

incl.

74

75

1

0.7

14.5

RC

Kingfisher

SGRD2055

743553

891249

392

165.5

90

-60

 

 

0

0

NSI

RCD

Kingfisher

SGRC2057

743585

891599

408

120

90

-60

 

 

0

0

NSI

RC

Kingfisher

SGRC2058

743646

891200

386

50

90

-60

 

 

0

0

NSI

RC

Kingfisher

SGRC2059

743613

891652

386

99

90

-60

35

42

7

4.9

1.3

RC

Kingfisher

 

 

 

 

 

 

 

90

95

5

3.5

1.5

RC

Kingfisher

SGRC2060

743617

891200

371

110

90

-60

 

 

0

0

NSI

RC

Kingfisher

SGRC2061

743585

891649

386

144

90

-60

 

 

0

0

NSI

RC

Kingfisher

SGRC2062

743618

891750

389

106

90

-60

 

 

0

0

NSI

RC

Kingfisher

SGRC2063

743590

891201

389

61

90

-60

 

 

0

0

NSI

RC

Kingfisher

SGRC2064

743627

891848

408

102

90

-60

43

52

9

6.3

0.6

RC

Kingfisher

SGRD2065

743595

891849

420

168.4

90

-60

 

 

0

0

NSI

RCD

Kingfisher

SGRD2066

743503

891340

400

240.4

90

-60

 

 

0

0

NSI

RCD

Kingfisher

SGRD2067

743526

891249

385

220

90

-69

127

136

9

6.3

0.7

RCD

Kingfisher

SGRD2068

743576

891800

404

203.3

90

-60

 

 

0

0

NSI

RCD

Kingfisher

SGRC2069

743646

891749

402

50

90

-60

16

24

8

5.6

0.8

RC

Kingfisher

SGRC2070

743658

891848

409

57

90

-60

 

 

0

0

NSI

RC

Kingfisher

SGRC2071

743641

891651

399

54

90

-60

 

 

0

0

NSI

RC

Kingfisher

SGRC2072

743626

891550

300

81

90

-60

44

49

5

3.5

2.8

RC

Kingfisher

 

 

 

 

 

 

incl.

48

49

1

0.7

12.9

RC

Kingfisher

SGRC2073

743594

891450

387

100

90

-60

 

 

0

0

NSI

RC

Kingfisher

SGRC2074

743623

891400

388

73

90

-60

67

72

5

3.5

2.8

RC

Kingfisher

SGRD2076

743538

891550

399

201.2

90

-60

124

132

8

5.6

1.5

RCD

Kingfisher

SGRC2100

743648

891154

382

50

90

-60

 

 

0

0

NSI

RC

Kingfisher

SGRC2101

743619

891150

383

91

90

-60

 

 

0

0

NSI

RC

Kingfisher

SGRC2102

743615

891252

387

40

90

-60

 

 

0

0

NSI

RC

Kingfisher

SGRD2105

743532

891447

385

168.1

90

-60

105

117

12

8.4

0.8

RCD

Kingfisher

SGRD2106

743564

891445

383

147.3

90

-60

90

98

8

5.6

0.7

RCD

Kingfisher

SGDD139

742496

892459

528

480.4

90

-60

375

383

8

5.6

8.5

DD

Sunbird

 

 

 

 

 

 

incl.

376

378

2

1.4

23.0

DD

Sunbird

 

 

 

 

 

 

 

395

401

6

4.2

3.7

DD

Sunbird

 

 

 

 

 

 

incl.

398

399

1

0.7

20.7

DD

Sunbird

SGDD140

742538

892460

533

360

90

-60

268

279

11

7.7

4.2

DD

Sunbird

 

 

 

 

 

 

incl.

270

271

1

0.7

24.8

DD

Sunbird

 

 

 

 

 

 

 

283

289

6

4.2

0.9

DD

Sunbird

 

 

 

 

 

 

 

301

310

9

6.3

8.8

DD

Sunbird

 

 

 

 

 

 

incl.

305

307

2

1.4

36.8

DD

Sunbird

 

 

 

 

 

 

 

324

336

12

8.4

4.6

DD

Sunbird

 

 

 

 

 

 

incl.

326

328

2

1.4

19.1

DD

Sunbird

SGRD2082

742549

892435

543

310.2

90

-60

230

231

1

0.7

12.5

RCD

Sunbird

 

 

 

 

 

 

 

264

271

7

4.9

8.0

RCD

Sunbird

 

 

 

 

 

 

incl.

264

265

1

0.7

40.1

RCD

Sunbird

SGRD2083

742519

892409

541

380.1

90

-60

305

307

2

1.4

3.3

RCD

Sunbird

 

 

 

 

 

 

 

338

341

3

2.1

6.0

RCD

Sunbird

 

 

 

 

 

 

incl.

338

339

1

0.7

16.2

RCD

Sunbird

 

 

 

 

 

 

 

359

368

9

6.3

6.6

RCD

Sunbird

 

 

 

 

 

 

incl.

360

362

2

1.4

21.4

RCD

Sunbird

SGRD2085

742489

892409

535

480

90

-60

 

 

0

0

NSI

RCD

Sunbird


Notes:

1.EOH: End of hole
2.NSI: No significant intercepts
3.ETW: Estimated true width
4.Depths and widths reported to nearest significant decimal place
5.RC: reverse circulation drilling |DD: diamond drilling tail | RCD: reverse circulation drilling with diamond tail

Photos accompanying this announcement are available at:
https://www.globenewswire.com/NewsRoom/AttachmentNg/31c2e992-51ac-4f0a-84b7-ec0231c86e52
https://www.globenewswire.com/NewsRoom/AttachmentNg/92eea30f-6032-4b2d-8c6b-022dbf1cb8a2
https://www.globenewswire.com/NewsRoom/AttachmentNg/b79fb788-1bf1-47da-bc90-6d60c0f48c32
https://www.globenewswire.com/NewsRoom/AttachmentNg/b177675e-4488-4891-acda-adffdaf4a35f