HIGHLIGHTS

  • Follow up drilling to July 2024 Tarcoola JORC Mineral Resource Estimate (MRE) confirms new adjacent zones of shallow pit floor gold mineralisation, with key high-grade assays including:[1]

Hole ID

Interval (m)

Grade (g/t Au)

Depth (m)

Including

TBM0212

5m

@

5.94

from

11m

1m @ 23.8g/t Au

TBM0209

4m

@

10.4

from

32m

1m @ 34.4g/t Au

TBM0215

6m

@

6.17

from

39m

2m @ 13.4g/t Au

TBM0215

5m

@

6.07

from

99m

1m @ 28.3g/t Au

TBM0213

7m

@

9.63

from

67m

2m @ 28.0g/t Au

Barton Gold Holdings Limited (ASX:BGD)(FRA:BGD3)(OTCQB:BGDFF) ( Barton or Company ) is pleased to confirm further high-grade open pit Perseverance Mine assays at the Tarcoola Gold Project ( Tarcoola) .

<strong>Figure 1 - Perseverance Mine with July 2024 MRE outline (red) and targeted drilling areas (green)</strong>
Figure 1 - Perseverance Mine with July 2024 MRE outline (red) and targeted drilling areas (green)

Commenting on the latest Perseverance Mine drilling results, Barton MD Alexander Scanlon said:

"We are pleased to confirm further high-grade mineralisation in the Perseverance Mine's open pit floor. This is expected to support the definition of additional JORC Resources and we plan to review potential extensions as we position our assets for a potential ‘Stage 1' operation utilising our fully permitted Central Gawler Mill."

New pit floor gold zone

Following the definition of a shallow new JORC MRE of ~20koz @ ~2 g/t Au in the Perseverance Mine's open pit floor, Barton completed another 10 holes (882m) of follow up drilling during July 2024. [2 ] Assay results have confirmed another pit floor gold zone to the east of the July 2024 MRE block model .

<strong>Figure 2 - Perseverance Mine JORC Resources outline (red) with significant new intersections</strong>
Figure 2 - Perseverance Mine JORC Resources outline (red) with significant new intersections

Hole ID

Interval (m)

Grade (g/t Au)

Depth (m)

Including

TBM209

4m

@

10.4

from

32

1m @ 34.4g/t Au from 33m

TBM211

4

@

1.4

from

50

1m @ 2.27g/t Au from 50m & 1m @ 2.49g/t Au from 53m

TBM212

5

@

5.94

from

11

1m @ 23.8g/t Au from 12m

TBM213

7

@

9.63

from

67

2m @ 28.0g/t Au from 68m

TBM215

6

@

6.17

from

39

2m @ 13.4g/t Au from 40m

and

3

@

2.65

from

62

and

3

@

2.83

from

74

and

5

@

6.07

from

99

1m @ 28.3g/t Au from 103m

Table 1 - Key high-grade assays from July 2024 Perseverance Mine follow up RC drilling

Resource modelling and extensions

Drilling has focused on testing shallow zones of the pit floor suspected to host further gold mineralisation, with the goal to infill and extend the July 2024 MRE block model and convert additional JORC Resources.

The new mineralisation encountered in this drilling is shallow (within 10-100m of the pit floor) and located east of the July 2024 MRE block model mineralisation. It is therefore anticipated that these materials will increase the total number of gold ounces which could be recovered from the same development profile.

The Company is also reviewing modelled, but unclassified, extensions for potential follow up drilling.