Lavras Gold Corp. Intersects 2.9 g/t Gold Over 59 Metres at Fazenda do Posto Gold Target, LDS Project, Southern Brazil and Provides an Exploration Update

In This Article:

* This intersection includes 4.3 g/t gold over 32 metres, including 30.3 g/t gold
over 1 metre
* Other results returned 0.7 g/t gold over 301 metres from surface with multiple higher grade sub intervals

Toronto, Ontario--(Newsfile Corp. - September 9, 2024) - Lavras Gold Corp. (TSXV: LGC) (OTCQX: LGCFF) ("Lavras Gold" or the "Company") is pleased to release the results from 12 new drillholes testing the Fazenda do Posto Gold Target, located at the western edge of the LDS Project in southern Brazil. Gold mineralization was intersected in eleven of the 12 new holes reported in this news release at the Fazenda do Posto Gold Target ("Fazenda do Posto" or "Fazenda Gold Target)".

The purpose of these drillholes was two-fold: (1) to better understand the geometry and grade distribution of this new gold discovery, and (2) to test for potential extensions of gold mineralization in several directions. The Fazenda Gold Target remains open to the west, north and northwest, south and at depth with the Butiá Gold Deposit occurring to the east. These new results continue to move Lavras Gold toward its short-term goal of defining an economically feasible gold resource on the LDS Project, focused on the Butiá Gold Deposit and the adjacent Fazenda do Posto Gold Target.

HIGHLIGHTS

Deposit Geometry

  • At Fazenda do Posto gold mineralization has been found beginning at surface and traced down to a vertical depth of about 400 metres and an areal extent of about 200 metres. The mineralized zone appears to be an irregular shaped pipe-like feature plunging to the northwest. The current results suggest that there may be several parallel northeast trending structures to the northwest that are important exploration targets that remain untested.

Drilling

Hole 24FP016 returned:

  • 59.0 metres grading 2.9 g/t gold from 233.0 metres, and including:

    • 50.0 metres grading 3.2 g/t gold from 238.0 metres, and including

    • 32.0 metres grading 4.3 g/t gold from 240.0 metres, and including

    • 3.0 metres grading 17.6 g/t gold from 253.0 metres, and including

    • 1.0 metre grading 9.6 g/t gold from 253.0 metres, and including

    • 1.0 metre grading 23.3 g/t gold from 254.0 metres, and including

    • 1.0 metre grading 30.3 g/t gold from 255.0 metres.

Hole 24FP017 returned:

  • 301.0 metres grading 0.7 g/t gold from surface and including:

    • 261.0 metres grading 0.8 g/t gold from 3.0 metres, and including

    • 27.0 metres grading 1.3 g/t gold from 50.0 metres, and including

    • 19.0 metres grading 1.1 g/t gold from 84.0 metres, and including

    • 7.0 metres grading 1.4 g/t gold from 84.0 metres, and including

    • 3.0 metres grading 1.4 g/t gold from 123.0 metres, and including

    • 14.0 metres grading 1.7 g/t gold from 144.0 metres, and including

    • 61.0 metres grading 1.4 g/t gold from 192.0 metres, and including

    • 22.0 metres grading 1.9 g/t gold from 192.0 metres