Q2 Metals Drills 188.6 M Interval of Continuous Spodumene-Pegmatite and Concludes the 2024 Summer Drill Campaign at its Cisco Lithium Property, James Bay Quebec Canada

In This Article:

Highlights:

  • An additional two (2) drill holes for approximately 1,188.1 metres (m) were completed during the Summer 2024 Drill Campaign and reported herein.

  • Drill hole CS24-022 encountered 14 spodumene-pegmatite intervals, with the 
    widest continuous interval of 52.3 m.

  • Drill hole CS24-023 encountered 15 spodumene-pegmatite intervals, with the 
    widest continuous interval of 188.6 m.

VANCOUVER, BC / ACCESSWIRE / September 24, 2024 / Q2 Metals Corp. (TSXV:QTWO)(OTCQB:QUEXF)(FSE:458) ("Q2" or the "Company") is pleased to provide an update on the Summer 2024 Drill Program at the Cisco Lithium Property (the "Property" or the "Cisco Property") located within the greater Nemaska traditional territory of the Eeyou Istchee James Bay region of Quebec, Canada.

The Summer 2024 Drill Campaign at the Cisco Lithium Property has concluded with a total of five (5) drill holes for approximately 2,609.9 m completed. Since May 2024, the Company has drilled a total of 6,359.7 m over 17 holes. All drill holes intercepted pegmatite with visual indications of spodumene mineralization identified.

"To say it's been a very productive first drill season for Q2 Metals at our Cisco Lithium Property is an understatement," said Q2 Metals President and CEO Alicia Milne. "The property continues to deliver, and we are pleased with what we're seeing and are eagerly awaiting the results from the now 13 drills holes that are yet to be reported."

"We have been incredibly fortunate to be able to have built as much value in an early-stage project in four months. We have just started on the Cisco Project and look forward to receiving the assays on the holes drilled as we continue to move forward with Cisco," said Q2 Metals VP of Exploration Neil McCallum.

The Summer 2024 Drill Campaign was focused on exploring the connection of the wide, continuous pegmatite zones that were encountered in holes CS24-010, CS24-018 and CS24-021. The last two holes of the season continued to confirm and expand the understanding of the main pegmatite zone.

The geological team has completed the core cutting and logging of the last two (2) drill holes (CS24-022 to 023) of the Summer 2024 Campaign and the samples have been dispatched to the SGS Canada preparation laboratory located in Val-d'Or, QC for mineral analysis to confirm the presence of lithium. The visual results of drill holes CS24-022 and CS24-023 are herein reported.

Summer 2024 Drilling Update

Figure 1. Map of Drilling area, Cisco Property