Q2 Metals Drills 347.1 Metre Interval of Continuous Spodumene-Pegmatite at its Cisco Lithium Property, James Bay Quebec Canada and Updates Financing Status

In This Article:

Highlights:

  • Three (3) drill holes for approximately 1,419 metres (m) have been completed during the Summer 2024 Drill Campaign.

  • Drill hole CS24-021 encountered five (5) spodumene-pegmatite intervals, with the
    widest continuous interval of 347.1 m, the longest interval announced by the Company to date.

  • Drill hole CS24-019 encountered 16 spodumene-pegmatite intervals, with the 
    widest continuous interval of 56.8 m.

  • Drill hole CS24-020 encountered 17 spodumene-pegmatite intervals, with the 
    widest continuous interval of 22.2 m.

VANCOUVER, BC / ACCESSWIRE / September 11, 2024 / Q2 Metals Corp. (TSX.V:QTWO)(OTCQB:QUEXF)(FSE:458) ("Q2" or the "Company") is pleased to provide an update from its Summer 2024 Drill Program at the Cisco Lithium Property (the "Property" or the "Cisco Property") located within the greater Nemaska traditional territory of the Eeyou Istchee James Bay region of Quebec, Canada.

The Summer 2024 Drill Campaign is focused on exploring the connection of the wide, continuous pegmatite zones encountered in holes CS24-010 and CS24-018, located approximately 300 m apart and continuing to drill the large (1.9 by 1.5 kilometres (km)) surface mineralized area in a systematic grid-like manner with wide hole spacing (200 m), and infill drilling in areas with better results. Three (3) drill holes (CS24-019 to 021) have now been completed for approximately 1,419 m and the visual results of each are herein reported on. All holes intercepted pegmatites with visual indications of spodumene mineralization identified.

"The Cisco Property continues to deliver and exceed expectations," said Q2 Metals President and CEO Alicia Milne. "The latest visuals from holes 19 to 21 reveal thick intersections of spodumene-mineralized pegmatite with beautiful white core and large crystals, reaffirming Cisco's immense potential and scale."

"With the verification of a large and continuous mineralized body at the core of our drill-tested area, hole 21 has been an absolute mindset shift for our team," said Q2 VP Exploration Neil McCallum. "Our next steps will be to continue to expand upon our already excellent results."

Summer 2024 Drilling Update

<i>Figure 1. Map of Drilling area, Cisco Property</i>
Figure 1. Map of Drilling area, Cisco Property

Drill holes CS24-019 and 020 were drilled approximately 100 m to the southwest of hole CS24-014 at the CO3 outcrop area, extending the drill-defined strike length to 850 m.

Drill hole CS24-021 was designed to test the Company's theory of the continuation of the large pegmatite intervals in drill hole CS24-010 which reported a continuous interval of 120.3 m at 1.72% Li2O including 19.0 m at 2.06% Li2O, and drill hole CS24-018 which included a wide continuous spodumene pegmatite interval of 215.6 m, with analytical results pending.