Summa Silver Drills High-Grade Mineralization in First Hole at the South Queen Target, Mogollon Project, New Mexico

In This Article:

1.4 km step-out hole on Queen Vein intersected 393 g/t Silver Equivalent* over 7.4 m

Vancouver, British Columbia--(Newsfile Corp. - February 27, 2024) - Summa Silver Corp. (TSXV: SSVR) (OTCQX: SSVRF) (FSE: 48X) ("Summa" or the "Company") is pleased to provide assay results from its first drill hole completed during the winter drill program at the high-grade silver-gold Mogollon Project, New Mexico (the "Mogollon Project").

Key Highlights (see attached figures)

  • First hole at the South Queen target intersected multiple zones of strong epithermal-related silver-gold mineralization, highlighted by:

    • 393 g/t silver equivalent* (64 g/t Ag, 3.9 g/t Au) over 7.4 m from 242.4 m down hole (60 m vertical depth), including 2,735 g/t silver equivalent* (320 g/t Ag, 28.6 g/t Au) over 1.5 m, and

    • 357 g/t silver equivalent* (186 g/t Ag, 2.2 g/t Au) over 0.9 m from 201.2 m down hole.

  • Size and Scale on the Queen Vein: This hole represents a 1.4 km step out on the Queen Vein where mineralization remains open in all directions.

  • Between Two Historic Producers: The newly intersected mineralized zone is located between the recently acquired Deadwood and Eberle mines, both of which were only mined at shallow-levels and remain untested at depth.

  • Additional Exploration Upside: Results support the high-prospectivity of the entire Queen Vein where mineralization is open along-strike and down-dip warranting systematic follow-up drilling.

  • Assays Pending: Drilling is now complete with results pending from two holes that tested for mineralization along-strike and below the Eberle Mine.

*Silver equivalent is calculated using US$20/oz Ag, US$1,800/oz Au with metallurgical recoveries of Ag - 90%, Au - 95%. AgEq = (Ag grade x Ag recovery)+((Au grade x Au recovery) x (Au price / Ag price)).

Galen McNamara, CEO, stated: "We designed this drill program to test the size and scale of mineralization on the Queen Vein. The targets were precisely planned and based on our extensive geological modelling efforts that have evolved over the past three years. Unsurprisingly, our first hole successfully intersected strong mineralization. We look forward to additional results and continuing to unlock value in what has long been an overlooked historic mining district."

Mogollon Exploration Drill Program

The winter drill program at the Mogollon Project was designed to test the silver and gold potential of zones along the north-striking Queen Vein. The targets (South Queen and Eberle) are the result of extensive data compilation efforts which have evolved over several years and are designed to maximize discovery potential. The two targets are dispersed along 350 m of the Queen Vein south of the Consolidated target, where Summa focused its previous drill programs. The first hole of the program (MOG23-20) tested the South Queen target.