Tocvan Drilling Continues to Expand Mineralization at Pilar with Hits Along North Hill and Main Zone Gold-Silver Trends. Broader Corridor Begins to Tie Together

In This Article:

Highlights:

  • North Hill Trend Drilling Hits Broad Zone of Mineralization Starting from Surface with a High-Grade Zinc Centre

    • 300-meters East of the Main Zone

    • JES-24-95, 76.3 meters of 0.2 g/t Au, 1 g/t Ag and 0.4% Zn from 1.5 meters depth

      • Including, 7.6 meters of 0.2 g/t Au, 3 g/t Ag and 2.8% Zn

      • And 5.1 meters of 0.8 g/t

  • Main Zone Eastern Infill Hits Broad Mineralization with Elevated Silver and Zinc

    • JES-24-94, 24.4 meters of 0.2 g/t Au and 5 g/t Ag from 47.3 meters depth

      • Including, 1.5 meters of 1.3 g/t Au, 37 g/t Ag, 1.2% Zn and 0.5% Pb

      • And 1.5 meters of 0.5 g/t Au, 26 g/t Ag and 0.5% Zn

      • Also 3.1 meters of 0.4 g/t Au, 5 g/t Ag and 0.6% Zn

  • Five holes Released, All Five Intersect Mineralization

Results Pending for Three (3) Drillholes

CALGARY, AB / ACCESSWIRE / July 16, 2024 / Tocvan Ventures Corp. (the "Company") (CSE:TOC)(OTCQB:TCVNF)(FSE:TV3), is pleased to announce drill results from its 2024 Reverse Circulation (RC) drill program at its road accessible Pilar Gold-Silver project in mine-friendly Sonora, Mexico.

To date, the 2024 drill program has completed 3,268 meters across 26 drill holes. Results for three drill holes are currently pending analysis (green squares on Figure 1).

"Drill results are continuing to show the broad scale of mineralization at Pilar as we push out the edges of the known deposit." commented Brodie Sutherland, CEO. "The infill drilling looks to connect each of the three known trends to date, the results tell us that mineralization does connect across these corridors. Most of the area has never seen detailed drilling and to see mineralization and alteration in all holes showcases the robust system we have. We are also seeing areas with elevated base metals indicating multiple phases of gold and silver deposition, an excellent advantage when expanding and exploring across the greater Pilar area. To date, we have only drilled 2% of the total property area with surface sampling showing much bigger targets are present. A major producer is continuing to show a keen interest in the area conducting detailed review of the greater project area. The results today are supporting the case that we are just scratching the surface of the potential at Pilar. Results for exploration drilling 600 meters south of the Main Zone are still pending and surface work is ongoing. We look forward to updating our shareholders as more results become available."

Figure 1. Summary map of drill highlights and surrounding surface results.

Table 1. Summary of Drill Results Released Today from Pilar Project.