Tocvan Reports on Progress of the Pilar Gold - Silver Project

In This Article:

Highlights:

  • Total of 3,268 meters drilled from 26 RC Drillholes

  • Results pending for 11 drillholes totaling 1,442.8 meters

  • Summer Surface Mapping, Rock and Soil Sampling Planned Across Southern Block of Expansion Area

  • Definition of Expansion Area Footprint; Mine Development Planning

  • Placer Miners Open Up New Area in Northern Expansion Block Expanding Target Potential

CALGARY, AB / ACCESSWIRE / June 21, 2024 / Tocvan Ventures Corp. (the "Company") (CSE:TOC)(OTCQB:TCVNF)(FSE:TV3), is pleased to provide a progress update from its 2024 Reverse Circulation (RC) drill program at its road accessible Pilar Gold-Silver project in mine-friendly Sonora, Mexico.

To date, the 2024 drill program has completed 3,268 meters across 26 drill holes. Results for eleven drill holes are currently pending analysis (green squares on Figure 1). Drilling at Pilar has been paused to allow for the review of results and assess the summer weather conditions. A second drilling rig for core is being contemplated for later this year to expedite the build out of a robust geological model and accompany the remaining infill and step out drill holes for resource estimation.

"We are extremely pleased with the progress of the 2024 drill program, having completed 3.3 kilometers of the planned seven kilometers of drilling at Pilar already." commented Brodie Sutherland, CEO. "So far this year, we have hit the most significant step-outs ever at Pilar. With more results pending we are looking forward to the remaining half of the year. To enhance our understanding of Pilar and build out our geologic model, core drilling will be implemented again at Pilar. In 2022, an initial core program yielded some of the best results ever from the Main Zone, we look to continue that work this year. Across the broader expansion area numerous targets are taking shape, our focus will be on the immediate expansion of Pilar and defining new areas of mineralization along with areas suitable for mine development infrastructure. There is a large footprint to sample, and we are excited to display the ultimate scale of Pilar."

Current placer mining activity has increased along a new corridor heading northeast along the central part of the property (Figure 2). The new activity indicates another prospective area exists where no sampling data has been collected. The Company will evaluate the area for potential targeting. Across the Northern Alteration Zone (Figures 2 and 3) a major producer has been focused evaluating the exploration potential of the area. The Company is encouraged by their initial observations. An additional two weeks of work is expected across the expansive area.