Vision Lithium Provides a Review of 2023 and Discusses Plans for 2024

In This Article:

VAL-D'OR, QC, Jan. 8, 2024 /CNW/ - Vision Lithium Inc. (TSXV: VLI) (OTCQB: ABEPF) (FSE: 1AJ2) (the "Company" or "Vision Lithium") is very pleased to report on progress made in 2023 and discuss upcoming initiatives for 2024.

Vision Lithium Inc. Logo (CNW Group/Vision Lithium Inc.)
Vision Lithium Inc. Logo (CNW Group/Vision Lithium Inc.)

Sirmac Project

PEA announced in February 2023

In 2023, the Company released the results of a preliminary economic assessment (a "PEA"), announced February 21, 2023, which demonstrated the potential for Vision Lithium to develop the Sirmac deposit as a Direct Shipping Operation (DSO) with potentially very high returns.

PEA highlights (all results are reported in Canadian Dollars unless otherwise specified):

  • Pre-tax net present value ("NPV") (discount rate 5%) of C$183.6M, internal rate of return ("IRR") of 839% and payback less than 1 year

  • After-tax NPV (discount rate 5%) of C$104.8M, IRR of 484% and payback less than 1 year

  • Assumed DSO selling price of US$591 per tonne (/t) / C$797/t based on US$4,100/t concentrate pricing.

  • 4 years of mine life with 321,000t of DSO at 1.33% Li2O

  • Revenue of C$253.4M

  • Life of mine capital of C$3.1M

  • Operation cost per tonne of DSO at C$142

The PEA is preliminary in nature. Although 85% of the resources used for the PEA are measured & indicated, the report does include inferred mineral resources that are considered too speculative geologically to have the economic considerations applied to them that would enable them to be categorized as mineral reserves. There is no certainty that the PEA will be realized. Mineral resources that are not mineral reserves have not demonstrated economic viability. Additional work will be required to convert inferred mineral resources to indicated or measured mineral resources.

The technical report relating to the PEA can be found on the Company's website at www.visionlithium.com and under the Company's profile on SEDAR+. Readers are encouraged to read the PEA in its entirety, including all qualifications, assumptions and exclusions that relate to the details summarized in this news release February 21, 2023 and the Company's updated news release August 10, 2023. The PEA is intended to be read as a whole, and sections should not be read or relied upon out of context.

Sirmac Bulk Sample

The Company filed for a 50,000t bulk sample permit with the Ministry of Natural Resources and Forests (MNRF) of Québec and the Environmental and Social Impact Evaluating Committee (COMEV) for the territory governed by the James Bay and Northern Québec Agreement.  At least three groups have expressed interest in acquiring the ore for the bulk sample for testing purposes. Vision Lithium has signed multiple letters of interest and intent in this regard. The Company is in continuing discussions with representatives of the Government of Québec on the bulk sample permit and hopes to reach a conclusion on the permit application in 2024.