1911 Gold Initiates Surface Drill Program on New Exploration Targets at the True North Gold Mine

In This Article:

VANCOUVER, BC, Oct. 3, 2024 /CNW/ - 1911 Gold Corporation ("1911 Gold" or the "Company") (TSXV: AUMB) (OTCBB: AUMBF) (FRA: 2KY) is pleased to announce the mobilization of a drill rig for the 2024 surface drill program, commencing mid-October, 2024, at the Company's 100%-owned Rice Lake Gold property in Manitoba, Canada.

Highlights:

  • Initial 6,000 metre ("m") drill program planned to commence in mid-October, focusing on near surface targets within the True North Gold Mine footprint

  • Three (3) priority drill target areas generated through detailed data review, and updated geological interpretation:

    • San Antonio West Target, 3 drill holes totalling 1,200m testing a large target hosted within the prolific San Antonio mafic with historical drill intercepts of up to 3.38m @ 7.93 grams per tonne ("g/t") gold ("Au") and 3.08m @ 9.80 g/t Au

    • San Antonio Southeast Target, 4 drill holes totalling 2,500m testing a significant target area located within the San Antonio mafic with historical drill assays of up to 3.20m @ 6.25 g/t Au and 3.63m @ 4.01 g/t Au

    • Cohiba East Target, 3 drill holes totalling 1,300m testing two subparallel structures, covering the eastern extensions of the Cohiba mine, with historical drill intercepts of up to 1.58m @ 41.51 g/t Au and 5.85m @ 8.39 g/t Au, including 2.74m @ 13.17 g/t Au

  • An additional 1,000m have been allocated for follow-up drilling based on results

  • Additional drill targets expected to be generated following finalization of the mineral resource update later this month, focused on resource expansion drilling

Shaun Heinrichs, President & CEO, stated, "Our new team is very excited to be drilling several key targets at our True North Mine asset. The three target areas each show significant potential to host high grade gold mineralization and can be easily upgraded to mineral resources due to their close proximity to existing infrastructure and underground mine workings. With the forthcoming mineral resource estimate update we will also be looking to generate additional resource extension and expansion targets. The exploration team has also identified additional new resource drill targets at depth which, combined with the pending resource expansion targets and current shallow drill targets, highlight the significant potential to increase the gold resource base at the True North Gold Mine."

The 6,000m diamond drill program at the True North Gold Mine area has been designed to test the potential of high-grade vein hosted gold mineralization defined by: