Brunswick Exploration Drills 93.45 Meters at 1.55% Li2O at MR-6

In This Article:

Brunswick Exploration
Brunswick Exploration

MONTREAL, May 08, 2024 (GLOBE NEWSWIRE) -- Brunswick Exploration Inc. (TSX-V: BRW, OTCQB: BRWXF; “BRW” or the “Company”) is pleased to report more significant results from the Mirage winter drilling campaign. The Mirage Project is located in the Eeyou Istchee-James Bay region of Quebec approximately 40 kilometres south from the Trans-Taiga Road. The winter drill campaign focused on the Central Zone and has continued to intersect multiple wide well mineralized intervals on the MR-6 dyke and its vicinity where it remains open in all directions.

Highlights include:

  • Best interval to date at Mirage with 1.55% Li2O over 93.45 meters in drill hole MR-24-62 starting at surface and which extends the flat dipping MR-6 dyke a further 80 meters to the south-west.

  • The MR-6 dyke was also extended 135 meters to the north of MR-24-62 where BRW intersected 1.05% Li2O over 34.05 meters in drill hole MR-24-65.

  • MR-6 has now been drill traced over 220 meters of strike extent with real thickness varying from 25 meters and up to 70 meters. The dyke remains open in multiple directions with the strongest potential to the northeast and southwest.

  • New MR-8 dyke confirmed in the North zone with 1.27% Li2O over 18.6 meters in drill hole MR-24-43 and 1.42% Li2O over 11.5 meters in drill hole MR-24-55.

  • New exploration drill hole located approximately 800 meters northeast of MR-6 intersected anomalous lithium values in drill hole MR-24-53 within a zone of dykes stacking. With this hole, BRW continues to extend the central corridor of prospective dykes towards another spodumene bearing outcrop located 3.5 kilometers to the northeast.

  • A total of 26 drills holes results were received to date and 9 drills holes results style pending.

Mr. Killian Charles, President and CEO of BRW, commented: “With this latest set of results, MR-6 is rapidly becoming a top priority for Brunswick Exploration and will be the core focus of our next drill campaign. This is another very significant intercept which begins at surface and adds to the prior results which included 58 meters at 1.59% Li2O and 37 meters at 1.80% Li2O all starting from surface as well. Our understanding of the Mirage Project has grown tremendously over the last 6 months and we are extremely excited to announce our future plans for the project over the forthcoming weeks and months as we continue to see important exploration potential even outside the drill program area.”

Figure 1: Surface Map of the Mirage Project and Drill Holes Completed to Date

Surface Map of the Mirage Project and Drill Holes Completed to Date
Surface Map of the Mirage Project and Drill Holes Completed to Date


Table 1: Highlights from 2024 Winter Drilling Program Mentioned in this Release