Caledonia Mining Corporation Plc: Increases in mineral resources and mineral reserves estimates at Blanket Mine, publication of Annual Report on Form 20-F and notice of a shareholder webinar

In This Article:

Caledonia Mining Corporation Plc
Caledonia Mining Corporation Plc

ST HELIER, Jersey, May 15, 2024 (GLOBE NEWSWIRE) --  following the announcements of encouraging drilling results at Blanket Mine in Zimbabwe ("Blanket") on July 10, 2023 and January 30, 2024, Caledonia Mining Corporation Plc (“Caledonia” or “the Company”) (NYSE AMERICAN: CMCL; AIM: CMCL; VFEX: CMCL) is pleased to announce an increase to the mineral resources and mineral reserves estimates at Blanket.

The Company also announces that today it is filing with the U.S. Securities and Exchange Commission (the “SEC”) on EDGAR the Company’s Annual Report on Form 20-F for the fiscal year ended December 31, 2023 (the “Annual Report”). As per last year, the Annual Report was prepared in compliance with the SEC’s technical disclosure requirements for mining companies under subpart 1300 of Regulation S-K (“1300 S-K”). In accordance with 1300 S-K, the Annual Report includes estimates of mineral resources in addition to the mineral reserves for each of the Company’s mineral projects as at the end of the reporting period (i.e. December 31, 2023), on an attributable basis (i.e. in respect of Blanket, on the basis of its 64% ownership), with mineral resources presented exclusive of mineral reserves. This method of presentation differs from the Company’s other method of presentation of mineral resources and mineral reserves estimates under Canada’s National Instrument 43-101 (“NI 43-101”), which is done on a 100% project basis and mineral resources being inclusive of mineral reserves. The Company is also filing an NI 43-101 technical report in respect of an increase in Blanket’s mineral resources and mineral reserves estimates with SEDAR today (the “New Blanket NI 43-101”).

Highlights

  • Increase in Blanket’s 1300 S-K mineral reserve and mineral resource ounces by 111% and 36% respectively, with a 7% and 23% increase in mineral reserve and mineral resource grade respectively.

  • Increase in Blanket’s NI 43-101 mineral reserve and measured and indicated (“M&I”) mineral resource ounces by 106% and 63% respectively, with a 5% and 14% increase in mineral reserve and M&I mineral resource grade respectively.

  • Increase in Blanket’s NI 43-101 inferred mineral resource ounces by 26% with an increase in inferred mineral resource grade of 28%.

  • Blanket’s life of mine is estimated, based only on the updated mineral reserves estimate, to 2034. Management believes that the inferred mineral resources may, based on past successful conversion rates, further extend the life of mine past 2040.

  • Release of 1300 S-K mineral reserves and resources estimates at the Bilboes Gold Project (“Bilboes”) for the first time, which, using the same methodology, are similar to current NI 43-101 mineral reserves and mineral resources estimates.