CORRECTION FROM SOURCE - DLP Resources Inc.

In This Article:

In a news release issued July 16, 2024 by DLP Resources Inc., please note that certain of the highlighted mineralized intervals of drillhole A24-015 listed under the heading "Highlights" were erroneously stated. The correct figures are as follows (changes underlined):

  • 0.19% CuEq* over 966.50m (0.13% Cu, 0.0084% Mo and 1.43g/t Ag) from 6.00m to 972.50m.

  • 0.31% CuEq* over 32.00m (0.27% Cu, 0.0021% Mo and 3.62g/t Ag) from 36.00m to 68.00m.

  • 0.41% CuEq* over 431.00m (0.20% Cu, 0.0388% Mo and 1.75g/t Ag) from 362.00m to 793.00m.

  • 0.70% CuEq* over 179.50m (0.05% Cu, 0.1244% Mo and 0.50g/t Ag) from 793.00m to 972.50m.

In addition, in Figure 3, the word "geological" has been removed from the figure description, with the molybdenum values shown on the left of the drillhole graphic and the copper values shown within the drillhole graphic.

No other changes were required in the body or the tables, and the full release follows below:

DLP Resources intersects 431m of 0.41% CuEq* on the Aurora Project in Southern Peru.

Cranbrook, British Columbia--(Newsfile Corp. - July 16, 2024) - DLP Resources Inc. (TSXV: DLP) (OTCQB: DLPRF) ("DLP" or the "Company") announces receipt of complete drill results for drillhole A24-015 on the Aurora porphyry copper-molybdenum-silver project in southern Peru. (Figure 1).

Results for the first fourteen drillholes, A22-001, A22-002, A22-003, A23-004, A23-005, A23-006, A23-007, A23-008, A23-009, A23-010, A23-011, A23-012, A23-013 and A24-014 were last released on January 04, 2024 and June 25th, 2024 (see DLP Resources Inc., news release of January 04, 2024 and June 25, 2024 for results for the previous fourteen drillholes).

Highlights

Drillhole A24-015 was drilled approximately 220m east-southeast of drillhole A24-014 and intersected copper-molybdenum and silver mineralization throughout the hole to a depth of 793.00m. From 793.00m to end of hole at 972.50m molybdenum mineralization was intersected at the contact of the hornfels and early quartz-eye-feldspar-biotite porphyry. A24-015 ended in molybdenum mineralization and the most significant mineralized intervals included:

  • 0.19% CuEq* over 966.50m (0.13% Cu, 0.0084% Mo and 1.43g/t Ag) from 6.00m to 972.50m.

  • 0.31% CuEq* over 32.00m (0.27% Cu, 0.0021% Mo and 3.62g/t Ag) from 36.00m to 68.00m.

  • 0.41% CuEq* over 431.00m (0.20% Cu, 0.0388% Mo and 1.75g/t Ag) from 362.00m to 793.00m.

  • 0.70% CuEq* over 179.50m (0.05% Cu, 0.1244% Mo and 0.50g/t Ag) from 793.00m to 972.50m.

The complete set of results for A24-015 are summarized in Table 1 below.