Delta Drills 15.94 g/t over 10 metres at Delta-1, in Thunder Bay, Ontario

In This Article:

Kingston, Ontario--(Newsfile Corp. - March 1, 2024) - Delta Resources Limited ("Delta" or "the Company") (TSXV: DLTA) (OTC Pink: DTARF) (FSE: 6GO1) is pleased to provide final assay results for the first four (4) drill holes, and one (1) drill hole extension, from its initial 2024 drill campaign at its 100% owned Delta-1 Gold project. The holes reported total 1,371 metres of a 5,000 metre drill campaign previously announced on January 16, 2024 at the Delta-1 Gold project located 50 km west of Thunder Bay, Ontario.

The objective of this drill campaign is twofold:

  1. To fill in gaps from Delta's previous drilling within a mineral envelope already identified within a 2km strike and 250 metre vertical depth to further increase the overall mineral inventory and,

  2. Exploration drill holes to the east, west and further depths to demonstrate the potential of significantly expanding the mineral envelope.

Highlights:

  • Drill Hole D1-24-90 intersected 15.94 g/t gold over 10.0 metres,

  • Drill Hole D1-24-87 intersected 1.66 g/t over 10.5 metres,

  • Drill Hole D1-24-88 intersected 1.05 g/t over 12.2 metres,

  • Drill Hole D1-24-89 intersected 1.03 g/t over 16.1 metres,

  • Drill Hole D1-24-34ext intersected 1.09 g/t over 21.0 metres.

André Tessier, President, and CEO commented: "We are extremely pleased with these initial results from our 2024 drill campaign at the Delta 1 Gold deposit in Thunder Bay, Ontario. These results are a great way to start the year at Delta. Once more, the gold zones continue to show continuity and homogeneity. Drill hole D1-24-90 was especially excellent with high grades that are sure to help the economics of the deposit. We look forward to additional results from the current ongoing campaign."

Complete results from the first four (4) drill holes and one (1) drill hole extension are provided in Table 1 below. The 2024 drill campaign is ongoing with final assay results still pending.

TABLE 1: Table of new drilling results at the Delta-1 Project; February 29, 2024.

 DRILL HOLE

Easting

Northing

Elevation

Azimuth

Incl.

Length

FROM

TO

Au Grade

CORE LENGTH

NO

 (UTM Zone 16)

(m) 



(m)

(m)

(m)

(g/t)

(m)

D1-24-34*

290368

5385357

449

180

-70

344.3

33.00

196.00

0.76

163.00

 

 

 

 

 

 

incl.

33.00

75.50

1.31

42.50

 

 

 

 

 

 

incl.

33.00

45.00

2.08

12.00

 

 

 

 

 

 

incl.

115.50

142.00

1.11

26.50

 

 

 

 

 

 

incl.

150.00

171.00

1.09

21.00

 

 

 

 

 

 

 

217.00

224.10

1.17

7.10

D1-24-87

290363

5385284

455

180

45

222

35.30

45.80

1.66

10.50

 

 

 

 

 

 

incl.

41.70

45.80

3.63

4.10

 

 

 

 

 

 

 

65.50

70.90

1.23

5.40

 

 

 

 

 

 

 

102.50

121.00

0.37

18.50

 

 

 

 

 

 

 

192.00

192.80

22.30

0.80

D1-24-88

290539

5385267

443

180

45

294

114.00

126.20

1.05

12.20

 

 

 

 

 

 

incl.

125.30

126.20

7.24

0.90

D1-24-89

290599.02

5384971.8

455

0

45

348

169.50

171.00

4.31

1.50

 

 

 

 

 

 

 

199.90

216.00

1.03

16.10

 

 

 

 

 

 

incl.

215.00

216.00

9.40

1.00

 

 

 

 

 

 

 

276.00

282.00

1.05

6.00

 

 

 

 

 

 

 

294.00

313.00

0.42

19.00

D1-24-90

290658

5385194

445

180

45

300

106.00

109.00

1.38

3.00

 

 

 

 

 

 

 

113.00

123.00

15.94

10.00

 

 

 

 

 

 

incl.

113.80

114.80

57.80

1.00

 

 

 

 

 

 

incl.

120.20

121.10

99.40

0.90

 

 

 

 

 

 

 

132.40

143.50

0.64

11.10

 

 

 

 

 

 

 

212.50

218.30

1.60

5.80

*The intercepts of drill hole D1-23-34 include the intercepts of the initial 144m of the hole drilled in 2023 and previously reported.