DLP Resources Intersects 216.15m of 0.82% CuEq* Within an Interval of 1080.15m of 0.32% CuEq*on the Aurora Project in Southern Peru

In This Article:

Cranbrook, British Columbia--(Newsfile Corp. - August 15, 2024) - DLP Resources Inc. (TSXV: DLP) (OTCQB: DLPRF) ("DLP" or the "Company") announces receipt of complete drill results for drillhole A24-016 on the Aurora porphyry copper-molybdenum-silver project in southern Peru. (Figure 1).

Results for the first fifteen drillholes, were last released between January 04 and July 16, 2024 (see DLP Resources Inc., news release of January 04, 2024, June 25, 2024 and July 16, 2024 for results for the previous fifteen drillholes).

Highlights

Drillhole A24-016 was drilled off the same drill platform as A24-015 towards the northwest and intersected copper-molybdenum and silver mineralization throughout the hole to a depth of 1080.15m. The top of the hole from 0m to 89.00m intersected 0.48% CuEq* in mineralized hornfels and the lower 216.15m (864m to 1080.15m) intersected 0.82% CuEq* in mineralized hornfels and early quartz-eye-feldspar-biotite porphyry. A24-016 ended in molybdenum mineralization and the most significant mineralized intervals included:

  • 0.32% CuEq* over 1080.15m (0.15% Cu, 0.0318% Mo and 1.41g/t Ag) from 0.00m to 1080.15m

  • 0.48% CuEq* over 89.00m (0.31% Cu, 0.0003% Mo and 20.03g/t Ag) from 0.00m to 89.00m.

  • 0.24% CuEq* over 535.00m (0.18% Cu, 0.0082% Mo and 1.75g/t Ag) from 329.00m to 864.00m.

  • 0.82% CuEq* over 216.15m (0.09% Cu, 0.1397% Mo and 0.62g/t Ag) from 864.00m to 1080.15m.

The complete set of results for A24-016 are summarized in Table 1 below.

Mr. Gendall, President and CEO, commented: "A24-016 confirmed shallow copper mineralization in the eastern sector and we continue to expand the footprint of copper-molybdenum and silver mineralization at Aurora. Two drill rigs are currently drilling A24-017 and A24-018 in the northeast and southwest zones and we expect to extend copper-molybdenum mineralization in these areas. Results for A24-017 and A24-018 will be available for release in late September and early October."

Aurora Cu-Mo Project - Summary of Drill Results for A24-016

  • Drill hole A24-016 (Figures 2 and 3) commenced on June 19 on an azimuth of 320 degrees with an inclination of -70 degrees and ended on July 21 at 1080.15m. Summary geology is as follows:

    • 0 - 89.00m: Mineralized hornfels with chalcopyrite, chalcocite and covellite and sulphide-rich E-type veins within the weak enrichment zone.

    • 89.00m -329.00m: Weakly mineralized hornfels.

    • 329.00m - 897.10m: Mineralized hornfels with disseminated and veined sulphides of chalcopyrite, pyrite, pyrrhotite and minor molybdenum.

    • 897.10 - 1080.15m: Molybdenum mineralized early quartz-eye-feldspar-biotite porphyry with minor chalcopyrite. End of hole on July 21, 2024.