Honey Badger Silver Grows Nanisivik Project

White Rock, British Columbia--(Newsfile Corp. - October 21, 2024) - Honey Badger Silver Inc. (TSXV: TUF) (OTCQB: HBEIF) ("Honey Badger" or the "Company") is pleased to announce that it has added strategic claims through staking at its 100%-owned Nanisivik project, located on Baffin Island, Nunavut. These claims are deemed to have high geologic growth and discovery potential.

Honey Badger's CEO, Dorian L. (Dusty) Nicol, commented, "Our recent historic drill and geophysical data analysis (news release dated September 16, 2024), revealed several high-priority targets that may be silver-rich massive sulphide bodies. To capture the full benefit of these and additional potential silver-rich targets for our shareholders we staked new claims at very low cost. We are extremely excited by our new land position because of how it expands, at extremely low cost, the number of potential silver-rich targets. Our next steps will be to continue compiling and interpreting available data on these new claims, with a view to performing an initial field reconnaissance."

New Claims

The Company has recently increased the size of its mineral tenure around the past producing Nanisivik Mine on Baffin Island, Nunavut, which now comprises a total of 14 mineral claims covering some 13,373.2 hectares (ha). The Company's original Nanisivik Property comprised 4 claims totaling 5,722.8 ha that cover the former mine site. The company has staked an additional 10 claims totaling 7650.4 ha at and around the Nanisivik area. These claims cover geophysical anomalies identified during the Company's review of the historic data base (see news release dated September 16, 2024). The new claims comprise a further 3 claims that have added 1174.2 ha to the original Nanisivik claim block, 2 claims (1710.4 ha) covering the Chris Creek target located approximately 19 km southeast of Nanisivik, and further 5 claims (4765.8 ha) covering historical geophysical anomalies (conductors) in and around the Adams Sound and Adams River target areas approximately 40 km and 55 km, respectively, southeast of Nanisivik. The map below illustrates the locations of the new claims with respect to the geophysical anomalies.

To view an enhanced version of this graphic, please visit:
https://images.newsfilecorp.com/files/3204/227244_5db1c8ac14c1d999_001full.jpg

About Nanisivik

The Nanisivik Mine (near Arctic Bay, Nunavut) produced over 20 million ounces of silver between 1976 and 2002, from 17.9 million tons of ore, grading 9% zinc, 0.72% lead, and 35 grams per tonne silver (1). In addition to the polymetallic orebody, previous exploration identified massive sulphide bodies (principally pyrite) still in place, totaling about 100 million tonnes (1,2), containing locally anomalous base metal and silver values.