O3 Mining Intersects 102.0 g/t Au over 1.5 Metres at Malartic H, Marban Alliance

In This Article:

TSXV:OIII | OTCQX:OIIIF - O3 Mining

TORONTO, July 18, 2024 /PRNewswire/ - O3 Mining Inc. (TSXV: OIII) (OTCQX: OIIIF) ("O3 Mining" or the "Corporation") is pleased to announce that it has received the second set of assay results from its 24,505 metre drilling campaign completed between January 2024 and March 2024 on the Malartic H deposit "Malartic H") within the Marban Alliance project, in Val-d'Or, Québec, Canada (the "Marban Alliance Project").

Highlights:

  • 35.1 g/t Au over 4.5 metres in hole O3MA-24-678 at a vertical depth of 72.9 metres, including 102.0 g/t Au over 1.5 metres on Malartic H

  • 3.0 g/t Au over 15.4 metres in hole O3MA-24-655 at a vertical depth of 52.7 metres on Malartic H

  • 2.1 g/t Au over 19.3 metres in hole O3MA-24-678 at a vertical depth of 212.4 metres, including 31.7 g/t Au over 0.7 metre on Malartic H

O3 Mining's President and Chief Executive Officer, Mr. José Vizquerra commented: "The results from our exploration program at Malartic H continue to yield excellent intercepts. These intercepts represent the second set of assay results following the announcement of our initial positive assay results on April 17, 2024. Malartic H is consistently showing attractive results that increase the potential for growth laterally and at depth. Our team is currently completing additional drilling at Malartic H and we remain hopeful that this additional drilling could help support the quality and potential growth of the deposit. We are proud of the work completed to date at Malartic H which supports our belief in the robustness of the Marban Alliance Project and the Malartic H's role in the project."

The objective of the 2024 drilling campaign on the Malartic H deposit is the conversion of mineral resources that are currently classified as inferred mineral resources in the Corporation's current mineral resource estimate to the indicated mineral resource category (see news release of O3 Mining dated June 20, 2023 and entitled "O3 Mining Delivers Maiden Mineral Resource Estimate for Malartic H"). The winter portion of the 2024 drilling campaign totaled 121 drill holes of which assay results for 42 drill holes are being reported today (including eight holes with partial results), the results for 56 drill holes were previously reported (see news release of O3 Mining dated April 17, 2024 and entitled "O3 Mining Intersects 119.1 g/t Au over 2.5 Metres at Malartic H, Marban Alliance"), and the results for 23 holes are still pending. After a pause during the spring breakup period, the drilling campaign has resumed with a short drilling program of 5,700 metres needed to complete the drill spacing of 40 metres necessary for the category conversion. The Corporation will report the outstanding assay results as they become available.