Q2 Metals Clarifies Technical Disclosure

In This Article:

VANCOUVER, BC / ACCESSWIRE / August 20, 2024 / Q2 Metals Corp. (TSXV:QTWO)(OTCQB:QUEXF)(FSE:458) (" Q2 " or the " Company ") announces that, as a result of a technical review by the British Columbia Securities Commission, the Company is issuing the following news release to clarify its technical disclosure as it pertains to the news release issued on August 19, 2024.

The Company previously reported the cumulative grades of drill holes CS-24-007 to CS-24-010 at the Company's Cisco Property over ‘cumulative intervals' and ‘cumulative metres.' This disclosure has been removed from the August 19, 2024 news release as well as all previously issued news releases that reported cumulative intervals and/or cumulative metres.

As such, the highlights of the Company's inaugural drilling campaign at the Cisco Property included:

  • CS-24-010: Widest interval of 120.3 m at 1.72% Li 2 O including 19.0 m at 2.06% Li 2 O

  • CS-24-007: Widest interval of 27.1 m at 1.96% Li 2 O including 11.1 m at 2.49% Li 2 O

  • CS-24-008: Widest interval of 19.3m at 1.75% Li 2 O including 6.2 m at 2.23% Li 2 O

  • CS-24-009: Widest interval of 82.1m at 1.43% Li 2 O including 15.7 m at 1.88% Li 2 O

The analytical results reported represent the first 1,017 m of drilling over four (4) holes of the 3,753 m that were drilled over 12 holes at the Cisco Property. Initial visual results of those four holes were reported by the Company on June 17, 2024.

The Spring 2024 Drill Campaign was designed to expand upon the 2023 drilling by the Property vendors. Hole CS-23-05 ("Hole 5") drilled by the Property vendor ended in pegmatite and assays results confirmed its widest interval of 48.0 m at 1.23% Li 2 O including 9.0 m at 1.73% Li 2 O.

Holes CS-24-009 and 010 ("Hole 10") were designed as 50 m westward step-outs from Hole 5. Assay results from these two holes confirmed wide intervals of spodumene pegmatite, with the widest interval reaching 120.3 m at 1.72% Li 2 O, including 19.0 m at 2.06% Li 2 O in Hole 10.

Complete highlighted intervals from holes CS-24-007 to 010 are summarized in Table 1 and represented in Figure 1. All intervals of greater than two (2) metres of core-length are included in the table. Internal dilution of non-pegmatite material was limited to intervals of less than five (5) metres. No specific grade cap or lower cut-offs were used during grade and width calculations. All intervals are reported as core widths and mineralized intervals in all the holes drilled thus far are not representative of the true width as the modelled pegmatite zones are being refined with every additional hole.