Q2 Metals Drills 120.3 M at 1.72% Li2O including 19.0 M at 2.06% in First Assays Reported from its Spring 2024 Drill Campaign at the Cisco Lithium Property, James Bay, Quebec, Canada

In This Article:

Highlights:

  • Strong analytical results from the inaugural drilling campaign for Q2 Metals including:

    • CS-24-010: Cumulatively 181.1 metres ("m") at 1.67% Li2O

      • Widest interval of 120.3 m at 1.72% Li2O including 19.0 m at 2.06% Li2O

    • CS-24-007: Cumulatively 94.6 m at 1.52% Li2O

      • Widest interval of 27.1 m at 1.96% Li2O including 11.1 m at 2.49% Li2O

    • CS-24-008: Cumulatively 27.0 m at 1.63% Li2O

      • Widest interval of 19.3m at 1.75% Li2O including 6.2 m at 2.23% Li2O

    • CS-24-009: Cumulatively 115.9 m at 1.48% Li2O

      • Widest interval of 82.1m at 1.43% Li2O including 15.7 ma t 1.88% Li2O

VANCOUVER, BC / ACCESSWIRE / August 19, 2024 / Q2 Metals Corp. (TSX.V:QTWO)(OTCQB:QUEXF)(FSE:458) ("Q2" or the "Company") is pleased to report on the first core assay results from drill holes CS-24-007 to CS-24-010 from the Spring 2024 Drill Campaign at the Cisco Lithium Property (the "Property" or the "Cisco Property") located within the greater Nemaska traditional territory of the Eeyou Istchee James Bay region of Quebec, Canada.

"These first four holes of our inaugural drill program at Cisco have exceeded our expectations with higher grades within some of the wider intervals such as Hole 10," said Q2 Metals VP of Exploration, Neil McCallum. "We look forward to releasing more analytical results in the coming weeks as they become available."

"Between closing our financing earlier this month and the work we've done in the field, 2024 has been an exceptional year for Q2 Metals so far," said Q2 Metals President and CEO, Alicia Milne. "We have just begun our work at the Cisco Property, and having only completed 12 drill holes, these initial results are exceptionally promising."

The analytical results reported herein represent the first 1,017 m of drilling over four (4) holes of the 3,753 m that were drilled over 12 holes at the Cisco Property. Initial visual results of those four holes were reported by the Company on June 17, 2024.

The Spring 2024 Drill Campaign was designed to expand upon the 2023 drilling by the Property vendors. Hole CS-23-05 ("Hole 5") drilled by the Property vendor ended in pegmatite and assays results confirmed a total of 115.4 m at 1.40% Li2O, cumulatively within five (5) separate pegmatite intervals. Holes CS-24-009 and 010 ("Hole 10") were designed as 50 m westward step-outs from Hole 5. Assay results from these two holes confirmed wide intervals of spodumene pegmatite, with the widest interval reaching 120.3 m at 1.72% Li2O, including 19.0 m at 2.06% Li2O in Hole 10.