Q2 Metals Drills 215.6 Metre Interval of Continuous Spodumene-Pegmatite at Its Cisco Lithium Property, James Bay, Quebec, Canada

In This Article:

Highlights:

  • Four (4) additional drill holes for approximately 1,520.6 metres (m) have been completed at the Cisco discovery area (CO1 Zone) and the CO3 Zone, located 750 m south-west. Holes 17 and 18 are testing the CO4 and CO8 Zones, located south-east of the CO3 Zone.

  • Drill hole CS24-018 encountered 12 spodumene-pegmatite intervals for a total cumulative width of 363.4 m, including one continuous interval of 215.6 m, the longest interval announced by the Company to date.

  • Drill hole CS24-015 encountered six (6) individual spodumene pegmatite intervals, for a total cumulative width of 49.9 m.

  • Drill hole CS24-016 encountered three (3) spodumene pegmatite intervals, for a total cumulative width of 23.7 m.

  • Drill hole CS24-017 encountered 22 spodumene pegmatite intervals for a total cumulative width of 195.9 m.

  • Ground mapping and sampling has also confirmed the discovery of eight (8) additional spodumene-mineralized outcrop zones at surface in the area of interest which measures 1.9 by 1.5 kilometres (km).

VANCOUVER, BC / ACCESSWIRE / August 12, 2024 / Q2 Metals Corp. (TSX.V:QTWO)(OTCQB:QUEXF)(FSE:458) ("Q2" or the "Company") is pleased to provide an update from its 2024 exploration program at the Cisco Lithium Property (the "Property" or the "Cisco Property") located within the greater Nemaska traditional territory of the Eeyou Istchee James Bay region of Quebec, Canada.

Since the last update on July 3, 2024, four additional drill holes (CS24-015 to 018) have been completed for approximately 1,520.6 m, targeting the extension of the CO1 outcrop area towards CO3 and beyond.

Alicia Milne, Q2 Metals President and CEO stated, "Our inaugural drill program at the Cisco Property is going exceptionally well and we're excited about the mineralized pegmatite we continue to intersect. With the continued support of our shareholders, we are well funded and are looking forward to reporting on our assay results when they are received."

"The scale of the 215.6 metres of continuous pegmatite recovered in hole-18 has far exceeded our expectations and has confirmed our belief that the Cisco Property is potentially a world-class discovery," said Neil McCallum, Q2 Metals VP of Exploration. "We have really only just started, having drill tested about 10-percent of our total area of interest based on the surface work and we plan to continue to build scale by drilling in a systematic manner to understand the dimensions of what we have uncovered."

Spring 2024 Drilling and Sampling Campaign Update

A total strike length of 750 m of spodumene-mineralized pegmatite has now been defined by drilling and remains open in all directions. Holes 17 and 18 were designed to test the CO4 and CO8 zones, which are south-east of the CO3 Zone. Hole-18 has defined the width of the mineralized spodumene-pegmatite to 600 m (Figure 1).