Q2 Metals Drills 347.1 m at 1.35% Li2O Including 30 m at 1.76% Li2O at the Cisco Lithium Property, James Bay, Quebec, Canada

In This Article:

Highlights:

  • Three (3) drill holes with strong analytical results from the summer drill campaign are reported herein and highlights include:

    • CS-24-021: Widest interval at 347.1 metres ("m") at 1.35% Li 2 O, including seven (7) higher-grade sub-intervals, including 30 m at 1.76% Li 2 O.

    • CS-24-017: Widest interval at 71.8 m at 1.01% Li 2 O, including 13.3 m at 1.77% Li 2 O.

    • CS-24-019: Widest interval at 56.8 m at 1.06% Li 2 O, including 9.1 m at 1.80% Li 2 O.

  • Core assay results for three (3) drill holes remain to be reported.

VANCOUVER, BC / ACCESSWIRE / October 28, 2024 / Q2 Metals Corp. (TSX.V:QTWO)(OTCQB:QUEXF)(FSE:458) (" Q2 " or the " Company ") is pleased to report the core assay results on drill holes CS-24-017, 019 and 021 from the 2024 drill campaign at the Cisco Lithium Property (the " Property " or the " Cisco Property ") located within the greater Nemaska traditional territory of the Eeyou Istchee James Bay region of Quebec, Canada. All drill holes intersected pegmatite with visual indications of spodumene mineralization identified.

"The results for drill hole 21 have been widely anticipated and it has delivered," said Alicia Milne, President and Chief Executive Officer of Q2 Metals. "We still have three more drill holes to report and are in the process of planning an accelerated exploration program in 2025 to understand the true potential at the Cisco Lithium Property."

" The results of the continuous, greater than 300 metres interval, has been yet another piece of validation to the story of Cisco, " said Neil McCallum, Vice President Exploration of the Company. "W e've drilled some world-class intervals already, but the development of Cisco is still in its infancy and we look forward to continuing our understanding of the project through further drilling in 2025."

The analytical results reported herein represent 1,431.1 m of drilling over three (3) holes during the summer drill campaign; with analytical results remaining to be reported on three (3) additional drill holes that were completed (drill holes CS-24-020, 022 and 023).

Complete highlighted intervals from holes CS-24-017, 019 and 021 are summarized in Table 1 and represented in Figure 1, with two cross sections in Figures 2 and 3.

Figure 1. Map of Recent Drill Holes with Analytical Results at Cisco Property

Drill holes CS-24-017 and 019 targeted the western portions of the wide mineralized zone. The results reveal several separate mineralized intervals including the widest interval of 71.8 m at 1.01% Li 2 O, including 13.3 m at 1.77% Li 2 O in CS-24-017and 56.8 m at 1.06% Li 2 O, including 9.1 m at 1.80% Li 2 O in CS-24-019 .