Sun Summit Mobilizes Field Crews for Inaugural Drill Campaign at the JD Project in BC

In This Article:

Vancouver, British Columbia--(Newsfile Corp. - July 9, 2024) - Sun Summit Minerals Corp. (TSXV: SMN) (OTCQB: SMREF) is pleased to announce the mobilization of its field crew to the JD Project in preparation for the Company's inaugural drill campaign. The JD Project, located in the prolific Toodoggone gold-copper mining district in north-central British Columbia, spans 15,000 hectares and hosts numerous under-explored epithermal-related gold-silver and porphyry-related copper-gold targets.

Highlights:

  • Inaugural drill campaign: Drilling is expected to commence in mid-July with a planned 3,000 metre program, targeting the near-surface, epithermal-related gold-silver mineralization within the Creek to Finn Corridor.

  • Field crews mobilized to site: Field personnel have been deployed to open camp and commence construction of drill platforms in preparation for drilling.

  • Comprehensive exploration program: The field program includes a 20-line kilometre Induced Polarization (IP) geophysical survey, up to 2,000 soil samples across select targets, detailed structural and geological mapping, and a property-wide LiDAR survey.

  • Strategic collaboration: Exploration activities will be supported by APEX Geoscience as the geological contractor and field manager, leveraging their extensive experience in the Toodoggone district.

  • Established infrastructure: The exploration crew will operate from Thesis Gold's established exploration camp on their adjacent Lawyers Property, facilitating an early and efficient start-up.

"The team at Sun Summit is excited to mobilize to site for our inaugural exploration program at the JD Project," stated Sharyn Alexander, Sun Summit's President. "We are focused on testing targets we believe have the highest discovery potential in a highly prospective area defined by continuous, near-surface Au-Ag mineralization. This inaugural exploration program is a direct result of the hard work we have been doing at compiling and interpreting public and private exploration data that represents over 50 years of exploration history over multiple targets. Interpretation and additional data digitization is ongoing and continues to highlight emerging mineralized targets. Drill target generation is advanced across multiple high-potential zones in the Creek to Finn Corridor and other high-potential target areas. We are eager to advance our exploration efforts in this highly prospective district, aiming to unlock the full potential of the JD Project."

Field Program Details

The summer drill program aims to build on the significant high-grade mineralization intercepted in historical drilling, in particular at the Creek Zone, where there is untested potential for sulphide-rich, structurally controlled, high grade gold intercepts. Limited drilling in 1997 returned values such as 22.0 metres* of 11.7 g/t Au including 4.0 metres of 61.2 g/t Au from drill hole CZ97-008 (see February 12, 2024, news release).