Yukon Metals Announces 2.4% Copper and Gold Values up to 6.64 g/t in Multiple Rock-Chip Samples at Birch

In This Article:

Yukon Metals Corp.
Yukon Metals Corp.

VANCOUVER, British Columbia, Oct. 16, 2024 (GLOBE NEWSWIRE) -- Yukon Metals Corp. (CSE: YMC, FSE: E770, OTCQB: YMMCF), the “Company” or “Yukon Metals”, is pleased to announce an exploration update on its 2,285-hectare Birch project, located approximately 65 km northeast of Burwash Landing.

Completed fieldwork at the Birch property (Figure 1) includes a soil sampling and prospecting program (Figures 2 to 6). Assays for 964 soil samples on a 50m x 100m grid over the northern and central portion of the claim block were received and show encouraging gold, copper and molybdenum results including a strong copper and gold anomaly in the north of the claim block. The anomalous zone trends roughly east-west and extends over 1,400 meters. Rock-chip float samples on the eastern portion of the zone returned up to 2.42 % copper with up to 0.94 g/t gold within pyrite-chalcopyrite rich skarn (Figure 2, Table 1). These strongly-oxidised massive sulfide boulders have been traced parallel to mapped east-west striking limestone-marble outcrops in the area.

Rory Quinn, President & CEO stated, “These additional geochemical results have reinforced the potential of the project to host a gold rich copper porphyry system. The positive identification of skarn mineralization fits well within the exploration model that we are developing for the Birch project. Once the new geophysical data is integrated with our mapped geology and geochemical data sets we will be able to design first pass drilling of the optimal targets scheduled for spring of 2025.”

Yukon Metals has also completed a shallow electrical resistivity and induced polarization geophysical survey over the anomalous northern zone to better define bedrock structure and rock type with results in process.

Table 1- Significant results from the 2024 prospecting program at Birch.

Sample

Au g/t

Ag g/t

Cu %

Zn %

Type

288068

6.64

2.1

0.22

0.01

Float

288069

1.62

0.3

0.02

0.00

Float

288071

0.57

0.5

0.01

0.01

Float

288094

1.29

0.7

0.03

0.00

Float

288095

0.10

4.9

0.94

1.92

Float

288096

0.24

3.7

0.62

15.55

Float

288097

0.04

1.5

0.42

0.08

Float

288098

0.16

6.3

1.16

2.08

Float

288100

0.07

8.5

0.25

5.87

Float

288158

0.94

42.1

2.42

0.08

Float

288159

0.33

34.1

0.63

0.04

Float

288160

0.17

3.2

0.32

0.01

Float

288161

0.09

4.5

0.52

0.01

Float

288162

0.67

72.8

2.40

0.09

Float

288163

0.03

4.1

0.19

0.02

Float

288164

0.15

14.6

0.41

0.01

Float

288165

0.40

2.9

0.05

0.00

Float

288166

0.02

1.9

0.13

0.01

Float

K137057

0.09

17.4

0.48

0.03

Outcrop

K137059

0.36

20.3

0.41

0.01

Float

K654501

14.05

12.0

0.43

0.01

Float


About the Birch Project

Yukon Metals owns 100% of the Birch project located 65km northeast of the community of Burwash Landing, and accessible via helicopter. Rock exposures at the Birch project area are dominated by frost-heaved boulders in unglaciated terrain, with outcrop present on steeper ridges. The project lies predominantly within the Finlayson assemblage of the Yukon-Tanana Terrane, consisting of variably carbonaceous schist and quartzite, marble, garnet amphibolite and rare metaplutonic rocks.